- Home
- HP Certification
- HP0-Y37 Exam
- HP.HP0-Y37.dumpsfiles Dumps
Free HP HP0-Y37 Exam Dumps Questions & Answers
| Exam Code/Number: | HP0-Y37Join the discussion |
| Exam Name: | Migrating &Troubleshooting Enterprise Networks |
| Certification: | HP |
| Question Number: | 104 |
| Publish Date: | Nov 10, 2026 |
|
Rating
100%
|
|
Total 104 questions
Click the Exhibit button and view the four exhibits.
You are replacing your Cisco distribution layer switches with HP E8212 zl switches. The Cisco switches have a VLAN map applied to VLAN 10 (subnet 10.1.10.0/24). The configuration for this VLAN map is as follows:
The exhibits display possible configurations for the HP ProVision ASIC-based E-Series switch. Which configuration controls traffic that arrives on VLAN 10 in the same way that the current Cisco switches do?
A company's network includes Cisco switches that are running PVST+. The distribution switches are configured as root and secondary root for all existing VLANs. There are 80 switches at the edge. In order to prepare for installing HP switches at the edge, the company's IT department wants to migrate PVST+ to MSTP. Which actions will help this company reduce downtime during the migration? (Select three.)
Click the Exhibit button and view a network diagram and two switch configurations.
What is the node mode of Switch 3 in RRPP Ring 3?
Click the Exhibit button.
A provider of MPLS services configures MPLS Layer-3 VPN services for two customers. Each customer has three branch offices that will be interconnected by MPLS Layer-3 VPNs. The address blocks chosen by the customers for each site are shown in the following chart:
The provider uses OSPF as its IGP with the Loopback 0 addresses shown as the OSPF router-id and the MPLS LSR-ID. A traceroute from Cust-A Site #1 to Cust-A Site #2 displays 5 intermediate routers. Which statements are true? (Select three.)
Click the Exhibit button.
You are planning to replace Cisco distribution layer switches with HP A-Series switches, and you are selecting a general strategy for the migration process. The strategy you select is to connect the new switches in parallel to the existing network. You will move the edge switch connections to the new distribution switches during the migration, as shown in the exhibitWhat is a disadvantage of this strategy?