- Home
- ISQI Certification
- CTFL-PT_D Exam
- ISQI.CTFL-PT_D.dumpsfiles Dumps
Free ISQI CTFL-PT_D Exam Dumps Questions & Answers
| Exam Code/Number: | CTFL-PT_DJoin the discussion |
| Exam Name: | ISTQB Certified Tester Foundation Level - Specialist Performance Testing |
| Certification: | ISQI |
| Question Number: | 42 |
| Publish Date: | Jul 18, 2026 |
|
Rating
100%
|
|
Total 42 questions
If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
* Natalie should make a presentation to the technical stakeholders In order to explain the performance test plan.
Question
Which ONE of the following options contains information that should be included in Natalie's presentation to the technical stakeholders?
SELECT ONE OPTION
Identify the correspondences between the different tools (listed from 1 to 3) and their objectives and characteristics (listed from A to F).
1. Load generator.
2. Load management console.
3. Monitoring tool.
1. It monitors, records and/or analyzes the behavior of the component or system under test.
2. It creates the load and also collects the metrics for later communication.
3. It provides the control to start and stop the creation and execution of the user simulation.
4. It aggregates metrics from the various transactions that are defined within the load instances
5. It creates and runs multiple client instances that simulate user behavior.
6. It can effectively support a root cause analysis of performance in a system under test.
SELECT ONE OPTION
What are the main activities of performance test execution?
1. Monitoring all parts of the environment.
2. Setting up the load generation and monitoring tools.
3. Collecting and keeping all results and information related to the test.
4. Generation of a load against the SUT according to a load profile.
5. Parameterize the test scripts.
6. Setting up the system under test.
SELECT ONE OPTION
Which of following statements (listed I. to V.) are TRUE in characterizing result verification and error handling in a performance test script?
1. It is not necessary to verify that the script Is doing what It is supposed to do using Indirect methods, such as a database check.
2. The scripts should always include logical rules.
3. Manual intervention may be required to carry out remedial action in the event of an error.
4. Performance scripts should be subject to quality control and testing, just like any software product.
5. The default error handling of the performance test tools Is sufficient, so no additional checks need to be introduced.
SELECT ONE OPTION