You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Explanation:

Topic 1, CASE STUDY 1 Manufacturing Company
General information
A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.
Customization options
The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:

Customization restrictions
The following restrictions on customizations are in place:
* Green color can only be sold with the Legend Trim.
* Orange color can be sold with the Sport or Legend Trim.
* The ML seat must be included in the Legend package.
* The MS seat must be included in the Sport package.
Manufacturing facilities
The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.
Motorcycle manufacturing
The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.
Plastic manufacturing
Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.
Metal Parts
Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.
Facility
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Requirements
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Sales Order
The company has the following requirements for sales orders:
* During the configuration of a sales order, invalid combinations must be prevented.
* Each configuration must create a unique bill of material (BOM) and Route based on options selected.
* Sales pricing for the sales order must be based upon options selected.
* Due to emissions regulations, the motorcycles cannot be sold to the state of California.
Motorcycle manufacturing
The company has the following requirements for motorcycle manufacturing:
* Schedule labor only at the labor pool level without machines by day
* Produce motorcycles within a scheduled day in any order.
* Record actual production labor with start/stop times.
* Record manager approval of labor entered prior to posting.
* Post actual material consumption after production is finished.
Plastic manufacture
The company has the following requirements for motorcycle manufacturing:
* Schedule both labor and machines.
* Adjust schedules by using a Gantt chart.
* Backflush standard labor by operation.
* Post actual material consumption at the start of production.
* Track and allocate costs to the excess plastic.
* Report multiple molded part numbers during the same production run.
* Determine the correct mold to use on a production order.
* Generate a batch number for each production order.
Metal Parts
The company has the following requirements for metal parts manufacturing:
* Schedule shipments to the vendor for painting.
* Receive painted parts into inventory from the vendor.
* Track vendor inventory levels.
Default
You must configure defaults for manufacturing execution production orders to meet the following requirements:
* Ensure accuracy for production order pick list posting.
* Ensure correct pick list creation.
Issues
A). In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.
B). The company is manually calculating an 8% overhead on materials and posting a journal manually.
A manufacturer uses Dynamics 365 Supply Chain Management.
The engineering department constantly revises product designs to stay current with the latest technology. The customer service department places orders lot the products but frequently adds a prototype product version that is not yet operational.
The manufacturer requites a solution that notifies customer service if a prototype version is selected on a sales order.
You need to configure the solution.
What should you configure?
A company configures master planning to order large and expensive aluminum sheets that are only available at certain times of the year.
The warehouse manager reports that replenishment levels are too high, causing inventory value to be over budget. In addition, the aluminum sheets take up too much space on the shop floor.
You need to configure the appropriate replenishment method.
Which coverage dimension should you use?
A company is implementing Dynamics 365 Supply Chain Management. Items are grouped into finished goods, service, raw-metal, and taw-other.
The production manager reports an issue with steel shortages stopping production and must ensure all steel is reserved against production orders when they are scheduled. All other items are reserved when production orders are started.
You need to configure the reservations for production orders.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Explanation:

A company implements Dynamics 365 Supply Chain Management The company is setting up a production line to make a new product.
The new production line will run three shifts five days a week. Each shift produces 100 widgets. Each machine performs specific functions that represent a sequenced step in the manufacturing process. The process requires the use of a qualified machinist. One of the machinists who floats among machines requires time off for appointments every Tuesday and Thursday afternoon.
You must be able to track the availability of the floating worker and each machine, as well as schedule production orders for the new line based on capacity to perform the work.
You need to configure the route.
Which configuration option should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Explanation: