- Home
- Nutanix Certification
- NCP-CN Exam
- Nutanix.NCP-CN.dumpsfiles Dumps
Free Nutanix NCP-CN Exam Dumps Questions & Answers
| Exam Code/Number: | NCP-CNJoin the discussion |
| Exam Name: | Nutanix Certified Professional - Cloud Native v6.10 |
| Certification: | Nutanix |
| Question Number: | 111 |
| Publish Date: | Sep 05, 2026 |
|
Rating
100%
|
|
Total 111 questions
Some time ago, an EKS cluster was attached to be managed with NKP (Fleet Management). Now, a Platform Engineer has been asked to disconnect the EKS cluster from NKP for licensing reasons. After disconnecting the cluster, the developers realized that application changes are still being reflected in the EKS cluster, despite the fact that the EKS cluster was successfully detached from NKP. How should the engineer resolve this issue?

The Platform Engineer needs to expand an NKP Pro demo cluster due to workload capacity constraints. The demo cluster has 150 vCPUs available to it from a licensing standpoint. Each worker node has 8 vCPUs and each control plane node has 4 vCPUs.
Which two options are valid for expanding the demo cluster and remaining compliant with licensing? (Choose two.)
By default, a full cluster backup is occurring on a daily basis on an NKP-managed cluster. However, the Victory Finance team has requested that their applications be backed up four times a day. The user group has been assigned to the victory-finance-apps NKP workspace, and the applications have been deployed to the Kubernetes namespace victory-finance.
What is the procedure for scheduling the team's application backups?
A Kubernetes administrator needs to ensure that the following requirements are met whenever a new workload cluster is deployed to a workspace:
* Grafana Logging
* Grafana Loki
* Project LoggingHow would the administrator ensure that these components are deployed as part of a cluster deployment?
Which CAPI provisioning method requires creating an inventory file of the servers to become NKP nodes?