- Home
- USGBC Certification
- LEED-AP-O-M Exam
- USGBC.LEED-AP-O-M.dumpsfiles Dumps
Free USGBC LEED-AP-O-M Exam Dumps Questions & Answers
| Exam Code/Number: | LEED-AP-O-MJoin the discussion |
| Exam Name: | LEED AP Operations + Maintenance Exam |
| Certification: | USGBC |
| Question Number: | 104 |
| Publish Date: | Oct 17, 2026 |
|
Rating
100%
|
|
Total 104 questions
LEED Interpretations differ from Credit Interpretation Rulings (CIRs) as the role in LEED certification because LEED Interpretations are
The scenario will be displayed with each question for reference. Please use the scenario information when answering.
Central Office Park is a 153,000 ft2 (14 214 m2) existing commercial office building situated in a suburban business district.
During a recent operational audit, the management team confirmed that the building has 300 regular occupants. The building sees a daily average of 40 visitors and is located in an area with a Walk Score of 66.
To better understand occupant behavior, the team conducted a transportation survey during the current reporting period. The results revealed that 26% of the regular occupants commute using active and shared modes of transportation.
The property includes a surface parking lot with 100 total parking spaces. Historically, the owner has bundled parking passes with tenant leases at no additional cost. To pursue LTc2: Transportation Demand Management, they are planning to unbundle parking from all leases. Research confirms the local market rate for similar parking is $150 per month. To mitigate possible tenant dissatisfaction during the transition, the owner has proposed a policy of charging a discounted flat fee of $100 per month for each parking space.
Just outside the property line, a contiguous bicycle network is located 1,000 ft. (305 m) from the building ' s main entrance.
As part of a capital improvement plan to address decarbonization, the owner has allocated budget to install electric vehicle supply equipment (EVSE). They have selected Level 2, ENERGY STAR-certified chargers.
The owner has specified that the units be installed as standalone devices without a network connection to the utility provider or internet.
During a stakeholder meeting to discuss the new parking strategy, a tenant representative expresses concern about rising costs. To address this, the property manager presents the owner ' s discounted fee proposal as a compromise. Does this compromise meet the requirements for LTc2: Transportation Demand Management, Option 1. Unbundled Parking?
A LEED AP O+M is reviewing construction documents to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits. What aspects of each space should the LEED AP O+M consider?
Which of the following procedures is included in a facility maintenance audit to assess stewardship performance?
An office building in a coastal region is pursuing LEED O+M certification. Flooding and hurricanes were identified as priority hazards from the climate resilience assessment. The building already has an existing emergency response plan that highlights the priority hazards. The building provides annual emergency preparedness training, has procedures for traffic management and protocols for maintaining critical facilities and systems. Specific roles are assigned in advance for essential personnel, and the emergency response plan is updated annually. The plan is also communicated to relevant service providers, facilities staff and occupants.
What additional element should be included in the emergency response plan for the building to comply with the IPc1: Operational Planning for Resilience credit?