Latest PK0-005 Exam Premium Dumps provide by TrainingDump.com to help you Passing PK0-005 Exam! TrainingDump.com offers the updated PK0-005 exam dumps, the TrainingDump.com PK0-005 exam questions has been updated to correct Answer. Get the latest TrainingDump.com PK0-005 pdf dumps with Exam Engine here:
(385 Q&As Dumps, 40%OFF Special Discount: DumpsFiles)
Join the discussion
Question 4/294
During project initiation, a project manager is drafting a document that includes an outline of the high-level goals, objectives, milestones, and requirements. This document will be modified and finalized as more information becomes available. Which of the following best meets the requirements?
Correct Answer: A
A Preliminary Scope Statement outlines the initial project objectives, high-level requirements, and milestones. It serves as a foundational document during the initiation phase and is refined as the project progresses.
As per the CompTIA Project+ PK0-005 exam objectives, under Domain 1.1: Compare and contrast different project management roles and responsibilities, developing a preliminary scope statement is a key activity in defining the project's direction and scope.
As per the CompTIA Project+ PK0-005 exam objectives, under Domain 1.1: Compare and contrast different project management roles and responsibilities, developing a preliminary scope statement is a key activity in defining the project's direction and scope.
Add Comments
- Other Question (294q)
- Q1. A quality assurance team is based in three different locations To validate the project del...
- Q2. After a migration was completed and a financial system was deployed, users have been unabl...
- Q3. A contractor attended a project meeting that was exclusively for company employees. Which ...
- Q4. During project initiation, a project manager is drafting a document that includes an outli...
- Q5. During a brainstorming session, a project team is elaborating on what caused the unexpecte...
- Q6. Which of the following best represents the project impact to a company's brand value?...
- Q7. Two team members have a minor disagreement on how a task should be performed. The project ...
- Q8. Which of the following tools is best to use when conducting project meetings across time z...
- Q9. The high-level technical requirements for a new application state that the application sho...
- Q10. An existing application that is highly utilized by clients is moving to a new release. Whi...
- Q11. Given the following velocity chart: (Exhibit) Which of the following updates on the projec...
- Q12. Which of the following best describes why conducting lessons learned sessions is important...
- Q13. A project manager decided to host the development environment on a cloud service. Which of...
- Q14. When creating a project schedule, a project manager adds activities with zero duration. Wh...
- Q15. A project manager prefers to have immediate contact with team members because it allows fo...
- Q16. A project team is developing an application that will allocate a building's parking spaces...
- Q17. Which of the following best describes why a project manager would decide to sign a fixed-p...
- Q18. As a part of a project, structured cabling activities have been outsourced to another comp...
- Q19. A project team has just experienced an unexpected event and implemented a work-around. Whi...
- Q20. Several stakeholders have declined the invitation for the kickoff of a major digital trans...
- Q21. During a code implementation, a senior developer and junior tester are discussing the test...
- Q22. As part of the planning phase, a PM has defined tasks, durations, resources, and costs. Wh...
- Q23. SIMULATION During the project execution phase, Ann, a project manager, received an email f...
- Q24. A project manager buys an extended warranty for a set of servers. Which of the following r...
- Q25. A PM is working on the preliminary scope statement and identifies that this project has th...
- Q26. Halfway through a project, the sponsor states that the project is taking too long to compl...
- Q27. A project manager is overseeing the implementation of a major upgrade to a critical ERP sy...
- Q28. While working in a collaborative, online brainstorming session, team members send private ...
- Q29. Which of the following activities would be performed during the project closure phase when...
- Q30. Which of the following is a capital expense?
- Q31. A project coordinator has started a new project and is reviewing the following characteris...
- Q32. A PM learns about some communication issues with different stakeholders and team members. ...
- Q33. Which of the following would most likely take place when a team reviews the backlog and pr...
- Q34. Two developers are discussing the design solution for a particular feature. The meeting is...
- Q35. A piece of equipment has malfunctioned and is stalling the completion of a deliverable for...
- Q36. A team member identifies a critical issue in production. Which of the following should the...
- Q37. A company needs to have structured cabling installed in one of its buildings. Which of the...
- Q38. Which of the following can a project manager infer from the following velocity chart? (Exh...
- Q39. Which of the following offers administrators more direct control over operating systems?...
- Q40. A project implementation partner and the project manager disagree about completed requirem...
- Q41. Which of the following should occur when implementing an IT infrastructure change that tak...
- Q42. Which of the following can a project manager infer from the following velocity chart? (Exh...
- Q43. Which of the following is a consideration when determining a project's ESG factors?...
- Q44. Which of the following can a project manager infer from the following velocity chart? (Exh...
- Q45. A project manager is coordinating multiple teams of six people that will each provide feed...
- Q46. A project manager receives an escalation from an external group reporting that an expected...
- Q47. Which of the following describes three-tier architecture?...
- Q48. Which of the following pieces of data are examples of Pll?...
- Q49. A project team evaluated the performance of a new reporting system and the quantity of que...
- Q50. A project manager has decided to outsource portions of a project and will conduct a separa...
- Q51. During the stabilization phase for recently deployed software, an end user reports a bug t...
- Q52. A project manager working in a strong matrix organization was selected to manage a new pro...
- Q53. A system was implemented, and testing was successfully completed. Which of the following s...
- Q54.
- Q55. An opportunity emerged in the middle of a project life cycle. Which of the following is th...
- Q56. During an executive call, a project sponsor found out about issues with the project but wa...
- Q57. After a release, the project sponsor received an escalation from an executive about the ex...
- Q58. During a gate review meeting, the deliverable was rejected by the customer. INSTRUCTIONS R...
- Q59. Two stakeholders, who have a history of animosity toward one another, are in disagreement ...
- Q60. A program manager is reviewing the project portfolio and prioritizing each project based o...
- Q61. The goal of a project is to fulfill specific technical features requested by customers. Wh...
- Q62. A project manager, who finished a project some time ago, keeps receiving questions from an...
- Q63. A project team needs a tool to store information that is captured throughout the life cycl...
- Q64. A project manager was just assigned to a new project. Which of the following activities sh...
- Q65. During a gate review meeting, the deliverable was rejected by the customer. INSTRUCTIONS R...
- Q66. A global franchise requests that a company provide a solution to unify its operation world...
- Q67. Which of the following should be the PRIMARY basis for establishing metrics that measure t...
- Q68. Which of the following should be considered first when determining the privacy management ...
- Q69. A PM wants to provide a visual representation of how a project is organized into tasks and...
- Q70. A company is creating a new technology. The company is concerned that the project details ...
- Q71. Because the project team lacks hands-on experience, the project manager has decided to inv...
- Q72. A company wants to move its data from on premises to off premises. Which of the following ...
- Q73. Which of the following can be used to determine whether a sample product is within an acce...
- Q74. A project manager and team are reviewing a task that is supposed to take nine days to comp...
- Q75. Which of the following is the best example of a breach of physical security?...
- Q76. A company purchases new software. The project manager needs to present the new software's ...
- Q77. Halfway through a project, the sponsor states that the project is taking too long to compl...
- Q78. When introducing a new information asset, what is the MOST important responsibility of the...
- Q79. Although a project was successfully released into production a month ago, a project manage...
- Q80. Defects associated with project deliverables have been reported. The project team needs to...
- Q81. A team currently has a schedule for each sprint that changes after every iteration. The te...
- Q82. Which of the following provides the best justification for undertaking a project?...
- Q83. A financial manager reports that several employees' allocations from the past month appear...
- Q84. Two team members have a minor disagreement on how a task should be performed. The project ...
- Q85. A project team member has been interacting on personal social media instead of performing ...
- Q86. A customer requests some changes to a product, and those changes are approved by the CCB. ...
- Q87. During a code implementation, a senior developer and junior tester are discussing the test...
- Q88. A project manager is in the closing phase of an IT asset refresh project that involves the...
- Q89. Which of the following should be the PRIMARY basis for establishing metrics that measure t...
- Q90. During the execution phase, a new PM was assigned to a project. The PM received a request ...
- Q91. A project manager realizes that a project will not be completed on time due to resource co...
- Q92. How does data discovery assist with data classification'?...
- Q93. A PM is responsible for implementing a new customer relationship management system and has...
- Q94. While working with a contractor, the project manager identified a communication conflict. ...
- Q95. A system is scheduled to go live, and the client signed an SLA. Which of the following ele...
- Q96. During timeline creation, the project manager is unsure if the development team can comple...
- Q97. An IT intern was assigned to set up workstations as part of a project. The IT intern was v...
- Q98. (Exhibit) Given the following network diagram: Which of the following is the critical path...
- Q99. Which of the following statements best describes a content management system?...
- Q100. During an agile project, a team member checked the project artifacts in order to anticipat...
- Q101. A project sponsor asked the PM to provide a summary of the current financial status. The P...
- Q102. A PM needs to calculate the progress of the whole project scope for a presentation to the ...
- Q103. A project team is defining operational training, discussing a go-live date, and describing...
- Q104. A project manager has been informed that the delivery of required IT equipment will be del...
- Q105. Which of the following should occur when implementing an IT infrastructure change that tak...
- Q106. Which of the to and allowing interactive feedback from a project team?...
- Q107. As a result of an internal assessment, the steering committee states that the company does...
- Q108. A project team is working remotely from different locations across the country. As part of...
- Q109. Project stakeholders have asked the team to use Scrum to run a software implementation pro...
- Q110. A principle states 80% of the issues are the result of 20% of the causes. Which of the fol...
- Q111. A project team was instructed to refurbish old desktops. The following provides the detail...
- Q112. The client asks the project manager to establish a communication channel. The client wants...
- Q113. Which of the following PRINCE2 processes includes creating the project plan?...
- Q114. Which of the following is a quality assurance tool?...
- Q115. While developing a project charter, a PM discovers that some of the legal requirements hav...
- Q116. Which of the following best explains the importance of artifacts during the discovery/conc...
- Q117. A project manager prefers to have immediate contact with team members because it allows fo...
- Q118. A few weeks before a project is scheduled to be completed, the client asks to add a new fe...
- Q119. During a gate review meeting, the deliverable was rejected by the customer. INSTRUCTIONS R...
- Q120. A new junior PM who has ownership of a project does not understand how to manage conflicts...
- Q121. A project manager has decided to outsource portions of a project and will conduct a separa...
- Q122. A project is executed to migrate all data to a single system following the merger of two c...
- Q123. A development team, which is working on a software project demonstrates software functiona...
- Q124. A project manager was just assigned to a new project. Which of the following activities sh...
- Q125. A third party needs to perform a short-term task for which the duration cannot be accurate...
- Q126. A financial manager reports that several employees' allocations from the past month appear...
- Q127. Which of the following should be the PRIMARY basis for establishing metrics that measure t...
- Q128. A project sponsor is struggling to provide the latest project status information on a week...
- Q129. A project team was instructed to refurbish old desktops. The following provides the detail...
- Q130. An opportunity emerged in the middle of a project life cycle. Which of the following is th...
- Q131. A project manager is receiving reports of the actual project expenditures and, based on th...
- Q132. The project team determines that software installation can only begin after the desktops h...
- Q133. Which of the following concepts represents multiple resources interfaced to run reports?...
- Q134. Given the following velocity chart: (Exhibit) Which of the following updates on the projec...
- Q135. Which of the following statements best describes a content management system?...
- Q136. A project manager and team are reviewing a task that is supposed to take nine days to comp...
- Q137. A project is moving into the user acceptance testing phase. Several resources will be need...
- Q138. Which of the following activities would a project manager perform during the closing phase...
- Q139. Which of the following would be the most helpful in providing customers with an applicatio...
- Q140. A project sponsor asked the PM to provide a summary of the current financial status. The P...
- Q141. A piece of equipment has malfunctioned and is stalling the completion of a deliverable for...
- Q142. During a brainstorming session, a project team is elaborating on what caused the unexpecte...
- Q143. A project team selected a random sample of patient accounts for testing the deliverable. T...
- Q144. A project manager is meeting with business stakeholders to define the time frame for a go-...
- Q145. During a quality analysis review, the causes of several issues have been highlighted. Whic...
- Q146. During a stand-up meeting, a team member asks to include a change that an important stakeh...
- Q147. A project manager distributes minutes after each project meeting. However, the project man...
- Q148. Which of the following is a reason to use a SOW on a project?...
- Q149. During the project initiation phase, a project team has been identified. Which of the foll...
- Q150. An organization was fined due to an audit finding that revealed a third-party vendor was a...
- Q151. Which of the following aspects are true of agile as compared to waterfall? (Select two)....
- Q152. A project sponsor would like to develop a minimum viable product, but the requirements are...
- Q153. A project manager needs to develop a way to control who can modify documents, artifacts, a...
- Q154. Which of the following is the main reason for documenting artifacts?...
- Q155. A project manager does not have the power to reward team members when they accomplish some...
- Q156. A project team gathers weekly to review its progress. Which of the following is the projec...
- Q157. For an upcoming project kickoff. a PM is looking for a way to illustrate roles for major p...
- Q158. A project manager is coordinating multiple teams of six people that will each provide feed...
- Q159. A project manager will conduct a release on the third Friday of the month. The project man...
- Q160. A project manager has been assigned to a new project. During the planning phase, the proje...
- Q161. A project manager is assigned an initiative in a highly regulated industry that requires e...
- Q162. Which of the following contract types would be most beneficial to both parties in cases in...
- Q163. During a brainstorming meeting, a project manager identifies multiple techniques that will...
- Q164. During an active project, the finished product is not meeting quality specifications Which...
- Q165. Given the following velocity chart: (Exhibit) Which of the following updates on the projec...
- Q166. While developing a project charter, a PM discovers that some of the legal requirements hav...
- Q167. Which of the following BEST identifies the intent and purpose of a project closeout report...
- Q168. Two team members have a minor disagreement on how a task should be performed. The project ...
- Q169. A company is creating a new technology. The company is concerned that the project details ...
- Q170. Government projects require that personnel submit to background screenings for certain cle...
- Q171. An enhancement is set to be released into production, and availability issues need to be a...
- Q172. A project manager and team are currently in the planning phase of a project. Which of the ...
- Q173. Which of the following cloud models can be used to speed up the development of a service t...
- Q174. A project manager is in the process of evaluating the probability and impact of a risk by ...
- Q175. A PM is working on the schedule for a project that has technical tasks and requires a SME'...
- Q176. A global franchise requests that a company provide a solution to unify its operation world...
- Q177. Which of the following can a project manager infer from the following velocity chart? (Exh...
- Q178. During the testing process, testers have found multiple bugs that could jeopardize the pro...
- Q179. An IT intern was assigned to set up workstations as part of a project. The IT intern was v...
- Q180. A project manager is monitoring team performance by comparing committed versus completed w...
- Q181. A project manager has been assigned to a new project. During the planning phase, the proje...
- Q182. During a kickoff call, a project was rejected by the legal department due to the risk of v...
- Q183. A project team wants to compare two potential vendors' costs and risks for completing proj...
- Q184. A financial manager reports that several employees' allocations from the past month appear...
- Q185. During a status meeting for a multisystem program, a program manager learns that some deli...
- Q186. Although a project was successfully released into production a month ago, a project manage...
- Q187. Which of the following would be best to utilize when managing communications for project t...
- Q188. Which of the following would be considered operational security?...
- Q189. Given the following information: (Exhibit) Which of the following represents the critical ...
- Q190. Which of the following statements best describes zero-based budgeting?...
- Q191. A project manager queries stakeholders to identify the right communication channel to be u...
- Q192. A third party needs to perform a short-term task for which the duration cannot be accurate...
- Q193. * Planned Task Completion * Actual Task Completion Which of the following describes the st...
- Q194. A PM is meeting with the project team to identify the baseline go-live date, the operation...
- Q195. A project manager provided details regarding the completion of the following tasks: Equipm...
- Q196. Which of the following provides a layered approach to logging in to systems that contain a...
- Q197. Which of the following cloud models is designed to provide compute, storage, and networkin...
- Q198. A manufacturing company is experiencing a high number of defects in its products and wants...
- Q199. A PM wants to add a chart to the monthly status report to show major accomplishments for k...
- Q200. A PM wants to add a chart to the monthly status report to show major accomplishments for k...
- Q201. A project is moving into the user acceptance testing phase. Several resources will be need...
- Q202. A project scheduler updates the project status with the following information: SPI = 1.25 ...
- Q203. An IT intern was assigned to set up workstations as part of a project. The IT intern was v...
- Q204. A PM needs to calculate the progress of the whole project scope for a presentation to the ...
- Q205. Which of the following software programs would be best to use to store information related...
- Q206. As part of the planning phase, a PM has defined tasks, durations, resources, and costs. Wh...
- Q207. A project manager realizes that a project will not be completed on time due to resource co...
- Q208. While in the closing phase of a project, the project manager gathers feedback from stakeho...
- Q209. Which of the following provides the best justification for undertaking a project?...
- Q210. A project is about to start; however, the client is uncertain about the desired details fo...
- Q211. A project sponsor asked the PM to provide a summary of the current financial status. The P...
- Q212. A project manager provided details regarding the completion of the following tasks: Vendor...
- Q213. A risk management team for a software project decided to outsource the development of a sp...
- Q214. A project manager has been very diligent in maintaining the version control for the docume...
- Q215. A company is starting a new implementation project The stakeholders are reviewing RFP resp...
- Q216. An institution wants to implement software solutions to help manage the internal flow for ...
- Q217. A PM has identified all the resources involved in a project. The next step is to identify ...
- Q218. A team is analyzing the backlog in order to decide what to include in the next sprint. Whi...
- Q219. Which of the following is the best alternative to allow multiple users to edit a project p...
- Q220. During quality analysis, different team members are identifying multiple constraints. Whic...
- Q221. During a status meeting, the development team reviews work and finds an unforeseen depende...
- Q222. A project manager is eager to define access requirements during the initiation phase of a ...
- Q223. A project manager has received different functional requests from three individual stakeho...
- Q224. A project manager wants to be confident that the most crucial functions of a new software ...
- Q225. A project is executed to migrate all data to a single system following the merger of two c...
- Q226. A project manager prefers to have immediate contact with team members because it allows fo...
- Q227. Which of the following is the best example of a breach of physical security?...
- Q228. An IT infrastructure change request needs to be implemented in the production environment....
- Q229. A project manager is assigned to a multinational project with team members from different ...
- Q230. Which of the following is a quality assurance tool?...
- Q231. A project team evaluated the performance of a new reporting system and the quantity of que...
- Q232. During a brainstorming session, a project team is elaborating on what caused the unexpecte...
- Q233. Which of the following BEST identifies the intent and purpose of a project closeout report...
- Q234. During a gate review meeting, the deliverable was rejected by the customer. INSTRUCTIONS R...
- Q235. A project manager is in the closing phase of an IT asset refresh project that involves the...
- Q236. Defects associated with project deliverables have been reported. The project team needs to...
- Q237. A critical business initiative introduced new processes and technology to the organization...
- Q238. Which of the following communication tools would a project manager use to broadcast inform...
- Q239. A company needs to have structured cabling installed in one of its buildings. Which of the...
- Q240. While managing a project, a PM is assigned to work on a second project. The second project...
- Q241. Which of the following would help a project manager clearly see dependencies among tasks i...
- Q242. The project team determines that software installation can only begin after the desktops h...
- Q243. A key stakeholder recommends to a senior developer that a new feature be added. The new fe...
- Q244. During a brainstorming meeting, a project manager identifies multiple techniques that will...
- Q245. During the execution phase of a project, the project team faced an unexpected website down...
- Q246. A project manager is overseeing the implementation of a major upgrade to a critical ERP sy...
- Q247. The project team determines that software installation can only begin after the desktops h...
- Q248. Which of the following contract types in project procurement has the highest risk for the ...
- Q249. During a complex, multiyear project, a PM must discern which project tasks overlap so reso...
- Q250. After months of recruiting, a team finally found the right candidate for a very specific c...
- Q251. During the progress of a project, the stakeholders require the delivery of multiple milest...
- Q252. After determining the appropriate maintenance window, which of the following should occur ...
- Q253. A project manager learns that a handful of resources from the project were pulled off the ...
- Q254. A vendor manager communicates to the project manager that a shipment of new devices requir...
- Q255. During quality analysis, different team members are identifying multiple constraints. Whic...
- Q256. Which of the following is required to provide a hardware installation with a Tier 5 redund...
- Q257. A project team is developing an application that will allocate a building's parking spaces...
- Q258. Which of the following activities are important parts of the closing phase? (Select two)....
- Q259. A critical piece of equipment that is needed for the installation of a point-of-sale solut...
- Q260. A new junior PM who has ownership of a project does not understand how to manage conflicts...
- Q261. A project manager is assigned to a multinational project with team members from different ...
- Q262. During the project execution phase, Ann, a project manager, received an email from the pro...
- Q263. A project manager is reviewing a signed legal document pertaining to the hiring of a vendo...
- Q264. A system was implemented, and testing was successfully completed. Which of the following s...
- Q265. A project team gathers weekly to review its progress. Which of the following is the projec...
- Q266. A company is implementing a new radar system from July to September. The project manager k...
- Q267. A company is starting a new implementation project The stakeholders are reviewing RFP resp...
- Q268. The project team determines that software installation can only begin after the desktops h...
- Q269. A stakeholder raises a concern with a project manager because of the number of emails that...
- Q270. As a part of a project, structured cabling activities have been outsourced to another comp...
- Q271. A company that is implementing an updated version of its main product hired a new project ...
- Q272. A project manager makes a company-wide announcement about the successful completion of a p...
- Q273. A project manager was just assigned to a new project. Which of the following activities sh...
- Q274. A project team member wrote a user guide over the past ten days. Given the following scatt...
- Q275. Which of the following would help a project manager clearly see dependencies among tasks i...
- Q276. A company needs to have structured cabling installed in one of its buildings. Which of the...
- Q277. A critical piece of equipment that is needed for the installation of a point-of-sale solut...
- Q278. While working with a contractor, the project manager identified a communication conflict. ...
- Q279. Which of the following metrics BE ST measures the alignment of the information security pr...
- Q280. Several stakeholders have asked about how the requirements are being covered by the delive...
- Q281. A PM is working with stakeholders in the discovery phase and comparing the cost of the pro...
- Q282. An existing application that is highly utilized by clients is moving to a new release. Whi...
- Q283. A project manager prefers to have immediate contact with team members because it allows fo...
- Q284. A hurricane delays the shipment of critical equipment for a project. Which of the followin...
- Q285. (Exhibit) Given the following network diagram: Which of the following is the critical path...
- Q286. A project coordinator has started a new project and is reviewing the following characteris...
- Q287. Which of the following considers factors such as reliability, scalability, security, and c...
- Q288. Which of the following BEST describes how an organization should coordinate management of ...
- Q289. Given the following information: (Exhibit) Which of the following represents the critical ...
- Q290. A third party needs to perform a short-term task for which the duration cannot be accurate...
- Q291. Due to multiple changes, the sign-off for the project scope baseline is delayed. The proje...
- Q292. During an agile project, a team member checked the project artifacts in order to anticipat...
- Q293. Which of the following metrics BE ST measures the alignment of the information security pr...