Join the discussion
Question 1/83
Project tendering is an open economic activity. Therefore, it is necessary to publish information in an open manner.
Correct Answer: A
Add Comments
- Other Question (83q)
- Q1. Project tendering is an open economic activity. Therefore, it is necessary to publish info...
- Q2. What are the hard disk media retention service sales business matters? <multiple choice...
- Q3. Performance management, including what service content...
- Q4. Performance Subsidiary Service is a "platform + car" style, providing network and applicat...
- Q5. Huawei Co-Care service is provided by Huawei Service capabilities, the ability of joint pa...
- Q6. Which of the following components are used by FusionACCess to publish virtualized componen...
- Q7. Cloud IDC project government investment style (multiple choice)...
- Q8. Huawei Enterprise Network China Data Center L1 Integration Service Project Contract Level ...
- Q9. SmartNOS Bo is a subscription-based service that does not include a single evaluation opti...
- Q10. Huawei cloud service labor business let mode
- Q11. Huawei's acquisition and certification system is based on years of experience in informati...
- Q12. 59. When a customer's S5500T storage device is purchased for maintenance,...
- Q13. Huawei Data Center L1 Integration Service quotation includes (multiple choice)...
- Q14. Huawei product technology training is designed based on the entire life cycle of the servi...
- Q15. The main room of the Class A and Class B electronic information system rooms is directly e...
- Q16. Which of the following sub-cloud computing let 0 ? (multiple choices)...
- Q17. Huawei management training includes 7 (multiple choice)...
- Q18. Which of the following is not the service content of the ITO service solution?...
- Q19. The RAinBow tool needs to preliminarily determine whether a host is g capable of migrating...
- Q20. The GSM-R evaluation and optimization service expansion strategy is incorrect:...
- Q21. What are the challenges and challenges that customers face when they are running and maint...
- Q22. China does not currently sell data center L1 operation optimization service...
- Q23. Ke evaluation BE labor is one of the expansion actions of IP network evaluation optimizati...
- Q24. Backup service rollover, excluding T column (>...
- Q25. Although the MagicCube small machine migration breaks through the closed architecture, it ...
- Q26. UniSTARSCTSiS in the ICT-based 54 architecture integration service category does not inclu...
- Q27. Electronic information equipment should be powered by <>...
- Q28. The general contracting of engineering projects and the management of project projects are...
- Q29. Huawei Hk:are standard + and CoWare standard maintenance are the same for the service prov...
- Q30. The Global Evolution Center of the IP Planning and Design Service can provide 11M certific...
- Q31. There are GSM-R network evaluations and opportunities to optimize the work opportunities: ...
- Q32. In the process of maintenance and sales, 1 should pay attention to what aspects of the cus...
- Q33. Cloud's rapid development of its data center is a strategic opportunity for ITO because: (...
- Q34. The benefits that ITO brings to customers are (multiple choices)...
- Q35. What is the tool platform for the S-process network pipe?...
- Q36. The following must be scared to sell WLAN planning and design services? (multiple choices)...
- Q37. The digital center L1 integration service uses the special ii service with manual device t...
- Q38. What are the service components not covered by the WLAN planning and design service? (mult...
- Q39. Data center outsourcing and enterprise ii network outsourcing are the key sales disputes o...
- Q40. Which of the following steps does the FusionSphErE let migration basic process include? (m...
- Q41. Not worthy of the teaching center L1 total integration, the development of the brand, the ...
- Q42. What value can WLAN network planning and design services bring to customers? <multiple ...
- Q43. 46. What is the quotation of R in the quotation of the Optical Network Assessment Service?...
- Q44. 65. What benefits can the performance management service bring to the account? (multiple c...
- Q45. The total integration mode can be completed by one bidding...
- Q46. For the 7-year-old customers, all-round talent development is demanding, 15 only Huawei's ...
- Q47. Huawei platform software and general-purpose software service include: performance tuning ...
- Q48. The target of the construction project should be in line with the requirements of Taiwan a...
- Q49. What is the service component that is not included in the IP network planning and design s...
- Q50. Huawei SmartNOS subscription-style friends can split sales based on customer demand, inclu...
- Q51. Teaching Center L1 Integration Service Selling Point (multiple selection)...
- Q52. What are the advantages of Co-Care services ( > (multiple choices)...
- Q53. When using the UniSTAR SCT KS device to report the service fee, if the "committed" device ...
- Q54. What are the differences between desktop clouds and traditional PCs? (multiple choices)...
- Q55. Which of the following items are not included in the free warranty/replacement (1)...
- Q56. What does the work migration assessment survey contain? (1)...
- Q57. What steps are included in the implementation process of the Huawei Cloud Assessment Servi...
- Q58. _Co~Care standard maintenance service for C drills and above CSP Xiao 7...
- Q59. The engineer's on-site service must be purchased on the on-site service warranty or miscel...
- Q60. Which of the following maintenance packages provides 7-KTND spare parts pre-replacement (s...
- Q61. "Customer Support Services" in UniSTAR SCT with S What service products are not included? ...
- Q62. The power supply for the A-level electronic information system room should be powered by t...
- Q63. The structure of common teaching data backup has O (multiple choice)...
- Q64. The unprotected service is the original PJI technology service package. The HhCare or CoWa...
- Q65. The self-delivery and delivery of the L1 integration service of the Digital Center is sold...
- Q66. 77. For the 7-guarantee word pledge and sufficient superiors to press the time. What is th...
- Q67. What type of disaster relief plan type does not contain? (>...
- Q68. Which of the following is not a training and certification tool and platform provided by H...
- Q69. The redundancy capability of the 16TiEr4 Teaching Center is (>...
- Q70. With the "F", which is not worthy of HCIE's ability to learn the student's ability?...
- Q71. What is the difference between the WLAN after-sales network rules and the WLAN pre-sale ne...
- Q72. In the double disaster relief scheme, the distance between the FC and the livestock disast...
- Q73. IP planning set i + service division time server...
- Q74. Huawei is a founding member of Uptime JI
- Q75. The characteristics of the digital center L1 capture (multiple selection)...
- Q76. The L1 layer of the Teaching Center has made it possible to deepen the design phase of the...
- Q77. In the process of guiding customer training II, what is the reason for not considering 1?...
- Q78. In the pre-sales bidding stage, you should fully meet customer requirements....
- Q79. In the UniSTAR SCT, the "quote with the set of quotations" supports the quotation of W-typ...
- Q80. 175UmSTARSCTKS device "set S service", which service products are available for quotation?...
- Q81. Which of the following migration methods can achieve better smooth migration, and can cove...
- Q82. Advantages of Huawei Data Center L1 Purchasing Platform (multiple choice)...
- Q83. Which of the following activities does not include the performance of the large number?...
