DumpsFiles
 Request Exam  Contact
  • Home
  • PRACTICE EXAMS
    Oracle
    Fortinet
    Juniper
    Microsoft
    Cisco
    Citrix
    CompTIA
    VMware
    SAP
    EMC
    PMI
    HP
    Salesforce
    Other
  • View All Exams
  • New Dumps Files
  • Upload
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. ISACA
  3. Certified in Risk and Information Systems Control
  4. ISACA.CRISC.v2025-06-16.q663
  5. Question 53
Verified By Experts
40%off

CRISC Premium Bundle

Latest CRISC Exam Premium Dumps provide by TrainingDump.com to help you Passing CRISC Exam! TrainingDump.com offers the updated CRISC exam dumps, the TrainingDump.com CRISC exam questions has been updated to correct Answer. Get the latest TrainingDump.com CRISC pdf dumps with Exam Engine here:


(1890 Q&As Dumps, 40%OFF Special Discount: DumpsFiles)

Join the discussion

Question 53/663

A business unit is updating a risk register with assessment results for a key project. Which of the following is MOST important to capture in the register?

Correct Answer: C
A risk register is a tool that records and tracks the risks that may affect a project, as well as the actions that are taken or planned to manage them1. A risk register should include information such as the risk description, category, source, impact, likelihood, severity, owner, status, and response2. Among these, the most important information to capture in the risk register is the action plans to address risk scenarios requiring treatment. This is because the action plans are the specific steps that are taken to reduce, avoid, transfer, or accept the risks, depending on the chosen risk treatment option3. The action plans should be clear, realistic, measurable, and aligned with the project objectives and constraints4. The action plans should also be monitored and updated regularly to ensure that they are effective and appropriate for the changing risk environment5. The action plans are essential for managing the risks and ensuring the successful delivery of the project. The other options are not the most important information to capture in the risk register, as they are either less relevant or less actionable than the action plans. The team that performed the risk assessment is the group of people who identified, analyzed, and evaluated the risks, using various tools and techniques6. While this information may be useful for accountability and communication purposes, it is not as important as the action plans, as it does not indicate how the risks are treated or resolved. The assigned risk manager to provide oversight is the person who has the responsibility and authority to oversee the risk management process and ensure that the risks are properly identified, assessed, treated, and reported. While this information may be useful for governance and coordination purposes, it is not as important as the action plans, as it does not specify what actions are taken or planned to manage the risks. The methodology used to perform the risk assessment is the approach or framework that is used to identify, analyze, and evaluate the risks, based on the project context, scope, and objectives. While this information may be useful for consistency and transparency purposes, it is not as important as the action plans, as it does not describe how the risks are addressed or mitigated.
References = Risk and Information Systems Control Study Manual, 7th Edition, Chapter 2, Section 2.1.5, Page 55.

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.
Rating:
Other Question (663q)
Q1. A maturity model will BEST indicate:
Q2. Which of the following is the PRIMARY purpose of creating and documenting control procedur...
Q3. Which of the following BEST supports the management of identified risk scenarios?...
Q4. When collecting information to identify IT-related risk, a risk practitioner should FIRST ...
Q5. The risk to an organization's reputation due to a recent cybersecurity breach is PRIMARILY...
Q6. What should a risk practitioner do FIRST when vulnerability assessment results identify a ...
Q7. When creating a separate IT risk register for a large organization, which of the following...
Q8. Which of the following should an organization perform to forecast the effects of a disaste...
Q9. Who is BEST suited to provide information to the risk practitioner about the effectiveness...
Q10. If concurrent update transactions to an account are not processed properly, which of the f...
Q11. Which of the following is the BEST key performance indicator (KPI) to measure the effectiv...
Q12. Prior to selecting key performance indicators (KPIs), itis MOST important to ensure:...
Q13. Which of the following is MOST important when conducting a post-implementation review as p...
Q14. Which of the following approaches BEST identifies information systems control deficiencies...
Q15. A PRIMARY function of the risk register is to provide supporting information for the devel...
Q16. Which of the following is the MOST important consideration for prioritizing risk treatment...
Q17. Which of the following BEST mitigates the risk associated with inadvertent data leakage by...
Q18. Which of the following is the BEST control to detect an advanced persistent threat (APT)?...
Q19. A data center has recently been migrated to a jurisdiction where heavy fines will be impos...
Q20. Which of the following risk activities is BEST facilitated by enterprise architecture (EA)...
Q21. Which of the following is the FIRST step in risk assessment?...
Q22. Which of the following is a drawback in the use of quantitative risk analysis?...
Q23. It is MOST important for a risk practitioner to have an awareness of an organization s pro...
Q24. What information is MOST helpful to asset owners when classifying organizational assets fo...
Q25. IT management has asked for a consolidated view into the organization's risk profile to en...
Q26. Which of the following should be the PRIMARY driver for the prioritization of risk respons...
Q27. Which of the following will BEST ensure that controls adequately support business goals an...
Q28. Which of the following is the BEST method for determining an enterprise's current appetite...
Q29. When an organization's business continuity plan (BCP) states that it cannot afford to lose...
Q30. An organization allows programmers to change production systems in emergency situations. W...
Q31. Which of the following will BEST help to ensure implementation of corrective action plans?...
Q32. Which of the following would be MOST useful when measuring the progress of a risk response...
Q33. Which of the following is MOST important to ensure risk management practices are effective...
Q34. Read" rights to application files in a controlled server environment should be approved by...
Q35. Which of the following is the MOST important consideration when selecting digital signatur...
Q36. Which of the following is the BEST approach to use when creating a comprehensive set of IT...
Q37. Which of the following is the PRIMARY purpose of periodically reviewing an organization's ...
Q38. Which of the following is the BEST control for a large organization to implement to effect...
Q39. Which of the following is an IT business owner's BEST course of action following an unexpe...
Q40. Which of the following is MOST important for an organization that wants to reduce IT opera...
Q41. Which of the following is the BEST indicator of the effectiveness of a control monitoring ...
Q42. The PRIMARY purpose of a maturity model is to compare the:...
Q43. Which of the following presents the GREATEST security risk associated with Internet of Thi...
Q44. Which of the following would MOST likely drive the need to review and update key performan...
Q45. A segregation of duties control was found to be ineffective because it did not account for...
Q46. Who is PRIMARILY accountable for risk treatment decisions?...
Q47. An organization has just started accepting credit card payments from customers via the cor...
Q48. An organization has determined a risk scenario is outside the defined risk tolerance level...
Q49. A systems interruption has been traced to a personal USB device plugged into the corporate...
Q50. Which of the following is BEST used to aggregate data from multiple systems to identify ab...
Q51. Which of the following is the PRIMARY objective for automating controls?...
Q52. Which of the following poses the GREATEST risk to an organization's operations during a ma...
Q53. A business unit is updating a risk register with assessment results for a key project. Whi...
Q54. Following a significant change to a business process, a risk practitioner believes the ass...
Q55. Which of the following approaches will BEST help to ensure the effectiveness of risk aware...
Q56. Which of the following should be the FIRST course of action if the risk associated with a ...
Q57. Which of the following BEST enables the development of a successful IT strategy focused on...
Q58. During an IT department reorganization, the manager of a risk mitigation action plan was r...
Q59. The PRIMARY purpose of IT control status reporting is to:...
Q60. Which of the following emerging technologies is frequently used for botnet distributed den...
Q61. Which of the following is MOST important when considering risk in an enterprise risk manag...
Q62. Which of the following should be a risk practitioner's NEXT step upon learning the impact ...
Q63. Which of the following proposed benefits is MOST likely to influence senior management app...
Q64. In the three lines of defense model, a PRIMARY objective of the second line is to:...
Q65. An organization has four different projects competing for funding to reduce overall IT ris...
Q66. Which of the following is MOST likely to be impacted as a result of a new policy which all...
Q67. Which of the following actions should a risk practitioner do NEXT when an increased indust...
Q68. Which of the following is a specific concern related to machine learning algorithms?...
Q69. Which of the following is the ULTIMATE goal of conducting a privacy impact analysis (PIA)?...
Q70. A financial institution has identified high risk of fraud in several business applications...
Q71. Which of the following would present the GREATEST challenge when assigning accountability ...
Q72. Which of the following is MOST important when developing key risk indicators (KRIs)?...
Q73. Which of the following should be the GREATEST concern for an organization that uses open s...
Q74. An organization is concerned that a change in its market situation may impact the current ...
Q75. An organization learns of a new ransomware attack affecting organizations worldwide. Which...
Q76. Which of the following would be a risk practitioner's GREATEST concern related to the moni...
Q77. Management has required information security awareness training to reduce the risk associa...
Q78. Which of the following is the PRIMARY benefit of integrating risk and security requirement...
Q79. Which of the following is MOST important to the effective monitoring of key risk indicator...
Q80. Which of the following BEST informs decision-makers about the value of a notice and consen...
Q81. A risk practitioner has learned that an effort to implement a risk mitigation action plan ...
Q82. Which of the following events is MOST likely to trigger the need to conduct a risk assessm...
Q83. Which of the following should be the starting point when performing a risk analysis for an...
Q84. Which of the following risk register elements is MOST likely to be updated if the attack s...
Q85. In order to determining a risk is under-controlled the risk practitioner will need to...
Q86. Which of the following is the BEST way to ensure adequate resources will be allocated to m...
Q87. Senior management is deciding whether to share confidential data with the organization's b...
Q88. Which of the following will be MOST effective in uniquely identifying the originator of el...
Q89. Which of the following would be a risk practitioner's BEST course of action when a project...
Q90. Which of the following will BEST help to ensure the continued effectiveness of the IT risk...
Q91. Which of the following BEST enables an organization to determine whether external emerging...
Q92. Which of the following should be the PRIMARY focus of an IT risk awareness program?...
Q93. Who is responsible for IT security controls that are outsourced to an external service pro...
Q94. Which of the following would BEST help to ensure that identified risk is efficiently manag...
Q95. Which of the following is the BEST way to determine the potential organizational impact of...
Q96. Which of the following is the MOST important consideration when implementing ethical remot...
Q97. Which of the following BEST protects organizational data within a production cloud environ...
Q98. Which of the following should be the risk practitioner s PRIMARY focus when determining wh...
Q99. A hospital recently implemented a new technology to allow virtual patient appointments. Wh...
Q100. Accountability for a particular risk is BEST represented in a:...
Q101. When of the following 15 MOST important when developing a business case for a proposed sec...
Q102. Which of the following would be a weakness in procedures for controlling the migration of ...
Q103. An organization's risk tolerance should be defined and approved by which of the following?...
Q104. Which of the following would present the GREATEST challenge for a risk practitioner during...
Q105. A risk practitioner is reviewing accountability assignments for data risk in the risk regi...
Q106. Which of the following is MOST important for the organization to consider before implement...
Q107. Which of the following BEST indicates the condition of a risk management program?...
Q108. Which of the following can be interpreted from a single data point on a risk heat map?...
Q109. A control owner has completed a year-long project To strengthen existing controls. It is M...
Q110. Which of The following should be of GREATEST concern for an organization considering the a...
Q111. Mapping open risk issues to an enterprise risk heat map BEST facilitates:...
Q112. Which of the following should be of MOST concern to a risk practitioner reviewing the syst...
Q113. Which of the following is the MOST important benefit of implementing a data classification...
Q114. A risk practitioner recently discovered that sensitive data from the production environmen...
Q115. Which of the following would provide the MOST helpful input to develop risk scenarios asso...
Q116. Which of the following is the MOST important element of a successful risk awareness traini...
Q117. Which of the following is the BEST way to determine the value of information assets for ri...
Q118. Which of the following is the PRIMARY reason to establish the root cause of an IT security...
Q119. Which of the following presents the GREATEST challenge for an IT risk practitioner who wan...
Q120. Which of the following provides the BEST measurement of an organization's risk management ...
Q121. An organization has identified the need to implement an asset tiering model to establish t...
Q122. Which of the following would be the GREATEST concern related to data privacy when implemen...
Q123. Which of the following will BEST ensure that information security risk factors are mitigat...
Q124. Which of the following would be MOST beneficial as a key risk indicator (KRI)?...
Q125. Which of the following is MOST helpful to management when determining the resources needed...
Q126. An organization has decided to implement an emerging technology and incorporate the new ca...
Q127. Which of the following is the BEST way to quantify the likelihood of risk materialization?...
Q128. An organization's IT team has proposed the adoption of cloud computing as a cost-saving me...
Q129. An organization is participating in an industry benchmarking study that involves providing...
Q130. In an organization where each division manages risk independently, which of the following ...
Q131. From a business perspective, which of the following is the MOST important objective of a d...
Q132. Which of the following BEST enables a proactive approach to minimizing the potential impac...
Q133. Which of the following BEST prevents control gaps in the Zero Trust model when implementin...
Q134. Which of the following is MOST important to include when reporting the effectiveness of ri...
Q135. Which of the following will BEST support management repotting on risk?...
Q136. Which of the following is the BEST evidence that risk management is driving business decis...
Q137. What is the BEST approach for determining the inherent risk of a scenario when the actual ...
Q138. Which of the following is MOST critical to the design of relevant risk scenarios?...
Q139. To help ensure all applicable risk scenarios are incorporated into the risk register, it i...
Q140. Which of the following is MOST important for a risk practitioner to confirm once a risk ac...
Q141. When confirming whether implemented controls are operating effectively, which of the follo...
Q142. Which of the following will MOST improve stakeholders' understanding of the effect of a po...
Q143. When of the following provides the MOST tenable evidence that a business process control i...
Q144. What is the PRIMARY reason an organization should include background checks on roles with ...
Q145. An organization has engaged a third party to provide an Internet gateway encryption servic...
Q146. What is the PRIMARY benefit of risk monitoring?...
Q147. Which of the following key risk indicators (KRIs) is MOST effective for monitoring risk re...
Q148. An IT license audit has revealed that there are several unlicensed copies of co be to:...
Q149. An organization's internal audit department is considering the implementation of robotics ...
Q150. Which of the following BEST contributes to the implementation of an effective risk respons...
Q151. Which of the following scenarios presents the GREATEST risk for a global organization when...
Q152. A risk practitioner has collaborated with subject matter experts from the IT department to...
Q153. Which of the following is the GREATEST concern when using artificial intelligence (AI) lan...
Q154. The operational risk associated with attacks on a web application should be owned by the i...
Q155. Which of the following is the PRIMARY consideration when establishing an organization's ri...
Q156. A bank is experiencing an increasing incidence of customer identity theft. Which of the fo...
Q157. Which of the following is the MOST important component in a risk treatment plan?...
Q158. A data processing center operates in a jurisdiction where new regulations have significant...
Q159. A risk practitioner notices that a particular key risk indicator (KRI) has remained below ...
Q160. Which of the following is the GREATEST impact of implementing a risk mitigation strategy?...
Q161. Which of the following is a risk practitioner's MOST important responsibility in managing ...
Q162. Which of the following provides the BEST evidence that risk mitigation plans have been imp...
Q163. Several newly identified risk scenarios are being integrated into an organization's risk r...
Q164. Which of the following BEST indicates effective information security incident management?...
Q165. Which of the following roles would provide the MOST important input when identifying IT ri...
Q166. Which of the following is MOST helpful in aligning IT risk with business objectives?...
Q167. A risk practitioner has been asked to evaluate the adoption of a third-party blockchain in...
Q168. A risk register BEST facilitates which of the following risk management functions?...
Q169. Which of the following would MOST likely cause management to unknowingly accept excessive ...
Q170. An organization requires a third party for processing customer personal data. Which of the...
Q171. Which of the following is a PRIMARY benefit of engaging the risk owner during the risk ass...
Q172. A key risk indicator (KRI) is reported to senior management on a periodic basis as exceedi...
Q173. Which of the following is the MOST important enabler of effective risk management?...
Q174. Which of the following is the MOST important criteria for selecting key risk indicators (K...
Q175. An organization has operations in a location that regularly experiences severe weather eve...
Q176. A poster has been displayed in a data center that reads. "Anyone caught taking photographs...
Q177. The BEST metric to monitor the risk associated with changes deployed to production is the ...
Q178. Which of the following will BEST help an organization select a recovery strategy for criti...
Q179. Determining if organizational risk is tolerable requires:...
Q180. The MOST significant benefit of using a consistent risk ranking methodology across an orga...
Q181. Which of the following BEST enables senior management lo compare the ratings of risk scena...
Q182. A risk assessment has been completed on an application and reported to the application own...
Q183. Legal and regulatory risk associated with business conducted over the Internet is driven b...
Q184. An organization is subject to a new regulation that requires nearly real-time recovery of ...
Q185. Which of the following is the MOST important objective of an enterprise risk management (E...
Q186. Which of the following is the GREATEST risk associated with inappropriate classification o...
Q187. An organization has decided to commit to a business activity with the knowledge that the r...
Q188. Which of the following is the result of a realized risk scenario?...
Q189. An organization has made a decision to purchase a new IT system. During when phase of the ...
Q190. Which of the following is the MOST important reason to link an effective key control indic...
Q191. An organization wants to grant remote access to a system containing sensitive data to an o...
Q192. Which of the following is the BEST course of action when an organization wants to reduce l...
Q193. Which of the following methods would BEST contribute to identifying obscure risk scenarios...
Q194. Which of the following should be done FIRST when information is no longer required to supp...
Q195. Which of the following BEST supports the communication of risk assessment results to stake...
Q196. The PRIMARY benefit associated with key risk indicators (KRls) is that they:...
Q197. A multinational organization is considering implementing standard background checks to' al...
Q198. Which of the following will BEST help ensure that risk factors identified during an inform...
Q199. Which of the following is MOST important when determining risk appetite?...
Q200. Which of the following BEST facilitates the mitigation of identified gaps between current ...
Q201. After conducting a risk assessment for regulatory compliance, an organization has identifi...
Q202. The MOST important reason to aggregate results from multiple risk assessments on interdepe...
Q203. The PRIMARY reason for establishing various Threshold levels for a set of key risk indicat...
Q204. The MOST important reason to monitor key risk indicators (KRIs) is to help management:...
Q205. A control owner identifies that the organization's shared drive contains personally identi...
Q206. Which of the following scenarios is MOST important to communicate to senior management?...
Q207. Which of the following is the MOST critical element to maximize the potential for a succes...
Q208. Which of the following is MOST helpful when determining whether a system security control ...
Q209. Which of the following is the MOST useful information an organization can obtain from exte...
Q210. Which of the following is the PRIMARY accountability for a control owner?...
Q211. Which of the following should management consider when selecting a risk mitigation option?...
Q212. Which of the following is necessary to enable an IT risk register to be consolidated with ...
Q213. A risk action plan has been changed during the risk mitigation effort. Which of the follow...
Q214. Which of the following BEST represents a critical threshold value for a key control indica...
Q215. Which of the following BEST assists in justifying an investment in automated controls?...
Q216. The PRIMARY basis for selecting a security control is:...
Q217. What should be the PRIMARY objective for a risk practitioner performing a post-implementat...
Q218. Who should be PRIMARILY responsible for establishing an organization's IT risk culture?...
Q219. Who is the BEST person to the employee personal data?...
Q220. Which of the following risk register updates is MOST important for senior management to re...
Q221. A risk practitioner notices a risk scenario associated with data loss at the organization'...
Q222. Which of the following will BEST mitigate the risk associated with IT and business misalig...
Q223. Which organization is implementing a project to automate the purchasing process, including...
Q224. Several network user accounts were recently created without the required management approv...
Q225. Which of the following provides the BEST assurance of the effectiveness of vendor security...
Q226. Which of the following practices MOST effectively safeguards the processing of personal da...
Q227. Which of the following is the PRIMARY reason for logging in a production database environm...
Q228. A risk owner has identified a risk with high impact and very low likelihood. The potential...
Q229. The implementation of a risk treatment plan will exceed the resources originally allocated...
Q230. The percentage of unpatched systems is a:
Q231. Which of the following should be the PRIMARY goal of developing information security metri...
Q232. Which of the following is the GREATEST benefit for an organization with a strong risk awar...
Q233. What are the MOST important criteria to consider when developing a data classification sch...
Q234. Which component of a software inventory BEST enables the identification and mitigation of ...
Q235. Which of the following is MOST important to communicate to senior management during the in...
Q236. An organization recently experienced a cyber attack that resulted in the loss of confident...
Q237. Which of the following BEST helps to balance the costs and benefits of managing IT risk?...
Q238. Which of the following is MOST helpful in identifying gaps between the current and desired...
Q239. To minimize risk in a software development project, when is the BEST time to conduct a ris...
Q240. Which of the following is the MOST important key performance indicator (KPI) for monitorin...
Q241. Which of the following is the BEST key performance indicator (KPI) for determining how wel...
Q242. Print jobs containing confidential information are sent to a shared network printer locate...
Q243. Which of the following is the BEST approach for selecting controls to minimize risk?...
Q244. Which of the following outcomes of disaster recovery planning is MOST important to enable ...
Q245. When assessing the maturity level of an organization's risk management framework, which of...
Q246. An organization has restructured its business processes, and the business continuity plan ...
Q247. When classifying and prioritizing risk responses, the areas to address FIRST are those wit...
Q248. The BEST way to mitigate the high cost of retrieving electronic evidence associated with p...
Q249. Which of the following would present the MOST significant risk to an organization when upd...
Q250. Which of the following can be used to assign a monetary value to risk?...
Q251. A company has located its computer center on a moderate earthquake fault. Which of the fol...
Q252. The PRIMARY reason for periodic penetration testing of Internet-facing applications is to:...
Q253. For a large software development project, risk assessments are MOST effective when perform...
Q254. Which of the following is the BEST way to determine whether new controls mitigate security...
Q255. Which of the following BEST enables risk-based decision making in support of a business co...
Q256. A global organization is considering the acquisition of a competitor. Senior management ha...
Q257. Which of the following is the STRONGEST indication an organization has ethics management i...
Q258. The MAIN purpose of having a documented risk profile is to:...
Q259. Which of the following is the MOST important consideration when selecting key risk indicat...
Q260. A control owner responsible for the access management process has developed a machine lear...
Q261. Which of the following IT controls is MOST useful in mitigating the risk associated with i...
Q262. Which of the following is the BEST way to promote adherence to the risk tolerance level se...
Q263. An organization has outsourced its billing function to an external service provider. Who s...
Q264. Which of the following is MOST important to include in a risk assessment of an emerging te...
Q265. The objective of aligning mitigating controls to risk appetite is to ensure that:...
Q266. Which of the following MUST be assessed before considering risk treatment options for a sc...
Q267. After several security incidents resulting in significant financial losses, IT management ...
Q268. Sensitive data has been lost after an employee inadvertently removed a file from the premi...
Q269. The PRIMARY advantage of involving end users in continuity planning is that they:...
Q270. An identified high probability risk scenario involving a critical, proprietary business fu...
Q271. A MAJOR advantage of using key risk indicators (KRis) is that (hey...
Q272. Which of the following is the BEST course of action to reduce risk impact?...
Q273. Who should be responsible for approving the cost of controls to be implemented for mitigat...
Q274. Which of the following attributes of a key risk indicator (KRI) is MOST important?...
Q275. Which of the following is MOST important to review when evaluating the ongoing effectivene...
Q276. Which of the following is the MOST cost-effective way to test a business continuity plan?...
Q277. Which of the following is MOST important to ensure when continuously monitoring the perfor...
Q278. What is the GREATEST concern with maintaining decentralized risk registers instead of a co...
Q279. Where is the FIRST place a risk practitioner should look to identify accountability for a ...
Q280. Which of the following BEST enables effective risk-based decision making?...
Q281. Which of the following is a detective control?...
Q282. Which of the following would provide executive management with the BEST information to mak...
Q283. Which of the following controls will BEST detect unauthorized modification of data by a da...
Q284. During testing, a risk practitioner finds the IT department's recovery time objective (RTO...
Q285. The BEST way to improve a risk register is to ensure the register:...
Q286. A monthly payment report is generated from the enterprise resource planning (ERP) software...
Q287. Which of We following is the MOST effective control to address the risk associated with co...
Q288. During the control evaluation phase of a risk assessment, it is noted that multiple contro...
Q289. Which of the following is the BEST method to maintain a common view of IT risk within an o...
Q290. Which of the following methods is an example of risk mitigation?...
Q291. When reporting to senior management on changes in trends related to IT risk, which of the ...
Q292. Which of the following is the BEST method to identify unnecessary controls?...
Q293. An organization has opened a subsidiary in a foreign country. Which of the following would...
Q294. Which of the following criteria is MOST important when developing a response to an attack ...
Q295. Which of the following is the MOST important course of action for a risk practitioner when...
Q296. An information system for a key business operation is being moved from an in-house applica...
Q297. Which of the following BEST mitigates the risk of violating privacy laws when transferring...
Q298. Which of the following is the BEST way to determine software license compliance?...
Q299. Which of the following provides the MOST useful information for developing key risk indica...
Q300. A review of an organization s controls has determined its data loss prevention {DLP) syste...
Q301. Which of the following would be the BEST way to help ensure the effectiveness of a data lo...
Q302. When using a third party to perform penetration testing, which of the following is the MOS...
Q303. Which of the following is the BEST recommendation to address recent IT risk trends that in...
Q304. Whose risk tolerance matters MOST when making a risk decision?...
Q305. An organization with a large number of applications wants to establish a security risk ass...
Q306. An organization operates in an environment where reduced time-to-market for new software p...
Q307. Quantifying the value of a single asset helps the organization to understand the:...
Q308. Which of the following would be a risk practitioners' BEST recommendation for preventing c...
Q309. Which of the following is the BEST way to reduce the likelihood of an individual performin...
Q310. The PRIMARY benefit of classifying information assets is that it helps to:...
Q311. Which of the following is the MOST essential characteristic of a good IT risk scenario?...
Q312. Which of the following risk impacts should be the PRIMARY consideration for determining re...
Q313. Which of the following provides the MOST important information to facilitate a risk respon...
Q314. Which of me following is MOST helpful to mitigate the risk associated with an application ...
Q315. A risk assessment indicates the residual risk associated with a new bring your own device ...
Q316. Which of the following is the FIRST step when developing a business case to drive the adop...
Q317. Analyzing trends in key control indicators (KCIs) BEST enables a risk practitioner to proa...
Q318. Which of the following is the PRIMARY reason for an organization to include an acceptable ...
Q319. Which of the following observations from a third-party service provider review would be of...
Q320. Which of the following is MOST important to the effectiveness of key performance indicator...
Q321. The purpose of requiring source code escrow in a contractual agreement is to:...
Q322. Upon learning that the number of failed back-up attempts continually exceeds the current r...
Q323. Which of the following provides the MOST helpful information in identifying risk in an org...
Q324. Which of the following should be the PRIMARY input to determine risk tolerance?...
Q325. A global organization is planning to collect customer behavior data through social media a...
Q326. Who should be responsible for determining which stakeholders need to be involved in the de...
Q327. Which of the following is the BEST key control indicator (KCI) for a vulnerability managem...
Q328. Which of the following is the BEST way to help ensure risk will be managed properly after ...
Q329. Which of the following is a KEY responsibility of the second line of defense?...
Q330. An organization has experienced a cyber-attack that exposed customer personally identifiab...
Q331. Which of the following is the BEST course of action to help reduce the probability of an i...
Q332. Which of the following provides the MOST useful information to trace the impact of aggrega...
Q333. An organization has outsourced its IT security operations to a third party. Who is ULTIMAT...
Q334. Which of the following will BEST communicate the importance of risk mitigation initiatives...
Q335. Which of the following is the PRIMARY benefit of consistently recording risk assessment re...
Q336. Which of the following is the BEST indication that key risk indicators (KRIs) should be re...
Q337. To communicate the risk associated with IT in business terms, which of the following MUST ...
Q338. The MOST important objective of information security controls is to:...
Q339. Which of the following is the MOST useful input when developing risk scenarios?...
Q340. When documenting a risk response, which of the following provides the STRONGEST evidence t...
Q341. An enterprise has taken delivery of software patches that address vulnerabilities in its c...
Q342. A risk practitioner is organizing risk awareness training for senior management. Which of ...
Q343. Which of The following is the MOST comprehensive input to the risk assessment process spec...
Q344. Which of the following situations presents the GREATEST challenge to creating a comprehens...
Q345. A risk practitioner is preparing a report to communicate changes in the risk and control e...
Q346. A risk practitioner is reviewing a vendor contract and finds there is no clause to control...
Q347. A recent vulnerability assessment of a web-facing application revealed several weaknesses....
Q348. Which of the following is MOST important to the successful development of IT risk scenario...
Q349. A deficient control has been identified which could result in great harm to an organizatio...
Q350. Which of the following controls would BEST reduce the risk of account compromise?...
Q351. Which of the following methods is the BEST way to measure the effectiveness of automated i...
Q352. Which of the following is a risk practitioner's BEST course of action after identifying ri...
Q353. An organization is making significant changes to an application. At what point should the ...
Q354. The BEST way for management to validate whether risk response activities have been complet...
Q355. A risk practitioner is summarizing the results of a high-profile risk assessment sponsored...
Q356. During the control evaluation phase of a risk assessment, it is noted that multiple contro...
Q357. Which of the following BEST enables an organization to address new risk associated with an...
Q358. Which of the following is the FIRST step in managing the risk associated with the leakage ...
Q359. Which of the following is MOST important to identify when developing generic risk scenario...
Q360. Which of the following provides the MOST reliable evidence of a control's effectiveness?...
Q361. Which of the following should a risk practitioner do FIRST when an organization decides to...
Q362. Which of the following is the BEST metric to demonstrate the effectiveness of an organizat...
Q363. Which of the following is the BEST way to protect sensitive data from administrators withi...
Q364. The following is the snapshot of a recently approved IT risk register maintained by an org...
Q365. Which of the following should a risk practitioner recommend FIRST when an increasing trend...
Q366. An organization recently implemented a cybersecurity awareness program that includes phish...
Q367. Which of the following would be of MOST concern to a risk practitioner reviewing risk acti...
Q368. The BEST key performance indicator (KPI) to measure the effectiveness of a backup process ...
Q369. An unauthorized individual has socially engineered entry into an organization's secured ph...
Q370. Which of the following scenarios is MOST likely to cause a risk practitioner to request a ...
Q371. An organization has been experiencing an increasing number of spear phishing attacks Which...
Q372. An audit reveals that there are changes in the environment that are not reflected in the r...
Q373. Which of the following is MOST important for an organization to update following a change ...
Q374. Which of the following BEST facilities the alignment of IT risk management with enterprise...
Q375. During an acquisition, which of the following would provide the MOST useful input to the p...
Q376. Which of the following is MOST important to understand when determining an appropriate ris...
Q377. An organization is moving its critical assets to the cloud. Which of the following is the ...
Q378. Who should be responsible for strategic decisions on risk management?...
Q379. Which of the following is the BEST reason to use qualitative measures to express residual ...
Q380. After the announcement of a new IT regulatory requirement, it is MOST important for a risk...
Q381. Which of the following is MOST essential for an effective change control environment?...
Q382. An organization has provided legal text explaining the rights and expected behavior of use...
Q383. A risk practitioner has observed that there is an increasing trend of users sending sensit...
Q384. Which of the following is the PRIMARY reason to use key control indicators (KCIs) to evalu...
Q385. An organizational policy requires critical security patches to be deployed in production w...
Q386. Which of the following is the MOST important data attribute of key risk indicators (KRIs)?...
Q387. Which of the following is the BEST key control indicator (KCI) for risk related to IT infr...
Q388. Which of the following provides the MOST useful information to determine risk exposure fol...
Q389. Which of the following would BEST help secure online financial transactions from improper ...
Q390. The BEST indicator of the risk appetite of an organization is the...
Q391. The MOST important measure of the effectiveness of risk management in project implementati...
Q392. Which of the following is MOST important for mitigating ethical risk when establishing acc...
Q393. Reviewing which of the following BEST helps an organization gam insight into its overall r...
Q394. Which of the following is the BEST way to assess the effectiveness of an access management...
Q395. The PRIMARY reason a risk practitioner would be interested in an internal audit report is ...
Q396. Which of the following approaches to bring your own device (BYOD) service delivery provide...
Q397. Which of the following stakeholders are typically included as part of a line of defense wi...
Q398. An organization has outsourced a critical process involving highly regulated data to a thi...
Q399. An IT risk practitioner is evaluating an organization's change management controls over th...
Q400. An organization's business gap analysis reveals the need for a robust IT risk strategy. Wh...
Q401. An organization wants to transfer risk by purchasing cyber insurance. Which of the followi...
Q402. When reviewing a business continuity plan (BCP). which of the following would be the MOST ...
Q403. Which of the following would BEST facilitate the implementation of data classification req...
Q404. Which of the following is MOST likely to cause a key risk indicator (KRI) to exceed thresh...
Q405. An organization has detected unauthorized logins to its client database servers. Which of ...
Q406. Key control indicators (KCls) help to assess the effectiveness of the internal control env...
Q407. A risk practitioner is MOST likely to use a SWOT analysis to assist with which risk proces...
Q408. Which of the following is MOST important when discussing risk within an organization?...
Q409. In which of the following system development life cycle (SDLC) phases should controls be i...
Q410. During implementation of an intrusion detection system (IDS) to monitor network traffic, a...
Q411. Which of the following describes the relationship between risk appetite and risk tolerance...
Q412. Which of the following should be of GREATEST concern when reviewing the results of an inde...
Q413. An IT control gap has been identified in a key process. Who would be the MOST appropriate ...
Q414. Which of the following, who should be PRIMARILY responsible for performing user entitlemen...
Q415. Which of the following would be of GREATEST assistance when justifying investment in risk ...
Q416. Which of the following would BEST help an enterprise prioritize risk scenarios?...
Q417. An organization striving to be on the leading edge in regard to risk monitoring would MOST...
Q418. Of the following, whose input is ESSENTIAL when developing risk scenarios for the implemen...
Q419. Which of the following provides the MOST reliable evidence to support conclusions after co...
Q420. Which of the following is the PRIMARY objective of aggregating the impact of IT risk scena...
Q421. Which of the following will BEST support management reporting on risk?...
Q422. Which of the following is the GREATEST concern associated with business end users developi...
Q423. Which of the following is the MOST important step to ensure regulatory requirements are ad...
Q424. The risk associated with inadvertent disclosure of database records from a public cloud se...
Q425. Whether the results of risk analyses should be presented in quantitative or qualitative te...
Q426. Which of the following is the GREATEST benefit when enterprise risk management (ERM) provi...
Q427. Which of the following should be the risk practitioner s FIRST course of action when an or...
Q428. Which of the following is MOST important to consider when determining the value of an asse...
Q429. A risk practitioner's BEST guidance to help an organization develop relevant risk scenario...
Q430. Which of the following is MOST important to review when an organization needs to transitio...
Q431. Which of the following is the MOST appropriate action when a tolerance threshold is exceed...
Q432. Which of the following is the GREATEST concern when using a generic set of IT risk scenari...
Q433. During a risk assessment, the risk practitioner finds a new risk scenario without controls...
Q434. Which of the following should be the GREATEST concern to a risk practitioner when process ...
Q435. An organization has been made aware of a newly discovered critical vulnerability in a regu...
Q436. When developing a risk awareness training program, which of the following training topics ...
Q437. What would be MOST helpful to ensuring the effective implementation of a new cybersecurity...
Q438. What should be the PRIMARY consideration related to data privacy protection when there are...
Q439. Mitigating technology risk to acceptable levels should be based PRIMARILY upon:...
Q440. A large organization is replacing its enterprise resource planning (ERP) system and has de...
Q441. For no apparent reason, the time required to complete daily processing for a legacy applic...
Q442. Which of the following is the MOST important update for keeping the risk register current?...
Q443. An organization is implementing robotic process automation (RPA) to streamline business pr...
Q444. Which of the following practices BEST mitigates risk related to enterprise-wide ethical de...
Q445. An organization has established a contract with a vendor that includes penalties for loss ...
Q446. Which of the following is the MOST effective way for a large and diversified organization ...
Q447. An organization uses one centralized single sign-on (SSO) control to cover many applicatio...
Q448. A risk practitioner has identified that the organization's secondary data center does not ...
Q449. Which of the following is the GREATEST concern related to the monitoring of key risk indic...
Q450. The BEST way to validate that a risk treatment plan has been implemented effectively is by...
Q451. The maturity of an IT risk management program is MOST influenced by:...
Q452. Which of the following issues found during the review of a newly created disaster recovery...
Q453. A newly incorporated enterprise needs to secure its information assets From a governance p...
Q454. Which of the following is the MOST important consideration when prioritizing risk response...
Q455. An information security audit identified a risk resulting from the failure of an automated...
Q456. A risk assessment has revealed that the probability of a successful cybersecurity attack i...
Q457. Which of the following management actions will MOST likely change the likelihood rating of...
Q458. Which of the following BEST indicates whether security awareness training is effective?...
Q459. Management has noticed storage costs have increased exponentially over the last 10 years b...
Q460. Which of the following provides the MOST useful information when developing a risk profile...
Q461. Which of the following controls would BEST reduce the likelihood of a successful network a...
Q462. Following an acquisition, the acquiring company's risk practitioner has been asked to upda...
Q463. Which of the following is the PRIMARY reason to ensure policies and standards are properly...
Q464. Which of the following would MOST effectively reduce risk associated with an increase of o...
Q465. During a risk treatment plan review, a risk practitioner finds the approved risk action pl...
Q466. Before assigning sensitivity levels to information it is MOST important to:...
Q467. The PRIMARY objective of the board of directors periodically reviewing the risk profile is...
Q468. Which of the following should be management's PRIMARY consideration when approving risk re...
Q469. Which of the following would be the BEST justification to invest in the development of a g...
Q470. An organization's decision to remain noncompliant with certain laws or regulations is MOST...
Q471. Which of the following is the PRIMARY objective of a risk awareness program?...
Q472. Which of the following is the MOST important consideration when determining whether to acc...
Q473. Which of the following criteria for assigning owners to IT risk scenarios provides the GRE...
Q474. Which of the following is the PRIMARY factor in determining a recovery time objective (RTO...
Q475. When determining the accuracy of a key risk indicator (KRI), it is MOST important that the...
Q476. Which of the following is MOST important for developing effective key risk indicators (KRI...
Q477. After a risk has been identified, who is in the BEST position to select the appropriate ri...
Q478. Which of the following is MOST important for a risk practitioner to verify when evaluating...
Q479. Which of the following is the GREATEST concern when an organization uses a managed securit...
Q480. An organization has decided to postpone the assessment and treatment of several risk scena...
Q481. An organization has built up its cash reserves and has now become financially able to supp...
Q482. An incentive program is MOST likely implemented to manage the risk associated with loss of...
Q483. Which of the following is the MOST important consideration for the board and senior leader...
Q484. The PRIMARY objective of collecting information and reviewing documentation when performin...
Q485. An internal audit report reveals that not all IT application databases have encryption in ...
Q486. Which of the following is the MOST important information to cover a business continuity aw...
Q487. Which of the following should be the PRIMARY focus of a disaster recovery management (DRM)...
Q488. Which of the following techniques would be used during a risk assessment to demonstrate to...
Q489. The PRIMARY benefit of maintaining an up-to-date risk register is that it helps to:...
Q490. Which of the following is the BEST source for identifying key control indicators (KCIs)?...
Q491. Which of the following provides The MOST useful information when determining a risk manage...
Q492. Which of the following findings of a security awareness program assessment would cause the...
Q493. Which of the following is the MOST effective control to maintain the integrity of system c...
Q494. Which of the following is MOST useful for measuring the existing risk management process a...
Q495. Which of the following should be accountable for ensuring that media containing financial ...
Q496. Which of the following would BEST enable mitigation of newly identified risk factors relat...
Q497. Which of the following is the MOST important consideration for protecting data assets m a ...
Q498. Risk acceptance of an exception to a security control would MOST likely be justified when:...
Q499. Which of the following should be the PRIMARY basis for deciding whether to disclose inform...
Q500. Which of the following is a crucial component of a key risk indicator (KRI) to ensure appr...
Q501. Which of the following would BEST help minimize the risk associated with social engineerin...
Q502. An organization's Internet-facing server was successfully attacked because the server did ...
Q503. Which of the following is the MOST effective way to help ensure accountability for managin...
Q504. Which of the following should be the PRIMARY consideration when implementing controls for ...
Q505. An organization is implementing encryption for data at rest to reduce the risk associated ...
Q506. An organization has established a single enterprise-wide risk register that records high-l...
Q507. A recent regulatory requirement has the potential to affect an organization's use of a thi...
Q508. Which of the following is the MOST important consideration when developing risk strategies...
Q509. Within the three lines of defense model, the PRIMARY responsibility for ensuring risk miti...
Q510. Which of the following should be of MOST concern to a risk practitioner reviewing an organ...
Q511. Which of the following would BEST mitigate the ongoing risk associated with operating syst...
Q512. Which of the following is the PRIMARY reason for a risk practitioner to review an organiza...
Q513. Which of the following is the MOST important objective of establishing an enterprise risk ...
Q514. Which of the following is MOST appropriate to prevent unauthorized retrieval of confidenti...
Q515. A department allows multiple users to perform maintenance on a system using a single set o...
Q516. Which of the following is performed after a risk assessment is completed?...
Q517. A risk practitioner shares the results of a vulnerability assessment for a critical busine...
Q518. A bank recently incorporated Blockchain technology with the potential to impact known risk...
Q519. Which of the following observations would be GREATEST concern to a risk practitioner revie...
Q520. Which of the following is the GREATEST benefit of updating the risk register to include ou...
Q521. Which of the following would be the BEST way for a risk practitioner to validate the effec...
Q522. Which of the following is the MOST likely reason an organization would engage an independe...
Q523. Which of the following IT key risk indicators (KRIs) provides management with the BEST fee...
Q524. Which of the following is the GREATEST risk associated with the transition of a sensitive ...
Q525. Which of the following is the MOST effective way to integrate risk and compliance manageme...
Q526. Risk mitigation is MOST effective when which of the following is optimized?...
Q527. Which of the following would provide the MOST objective assessment of the effectiveness of...
Q528. An organization moved its payroll system to a Software as a Service (SaaS) application. A ...
Q529. Which of the following is the MOST important factor affecting risk management in an organi...
Q530. Which of the following would be the GREATEST concern for an IT risk practitioner when an e...
Q531. Of the following, who should be responsible for determining the inherent risk rating of an...
Q532. Which of the following is MOST important to sustainable development of secure IT services?...
Q533. Which of the following is MOST important to update when an organization's risk appetite ch...
Q534. Which of the following provides the MOST comprehensive information when developing a risk ...
Q535. An organization has agreed to a 99% availability for its online services and will not acce...
Q536. Which of the following is the MOST effective way to reduce potential losses due to ongoing...
Q537. Which of the following is the MOST important success factor when introducing risk manageme...
Q538. An organization's board of directors is concerned about recent data breaches in the news a...
Q539. Which of the following resources is MOST helpful when creating a manageable set of IT risk...
Q540. Which of the following is the MOST important consideration when selecting either a qualita...
Q541. Which of the following trends would cause the GREATEST concern regarding the effectiveness...
Q542. Which of the following tools is MOST effective in identifying trends in the IT risk profil...
Q543. Which of the following is the BEST indicator of executive management's support for IT risk...
Q544. Well-developed, data-driven risk measurements should be:...
Q545. Which of the following will BEST help to ensure key risk indicators (KRIs) provide value t...
Q546. A rule-based data loss prevention {DLP) tool has recently been implemented to reduce the r...
Q547. A risk practitioner observes that the fraud detection controls in an online payment system...
Q548. An organization is planning to acquire a new financial system. Which of the following stak...
Q549. Which of the following is the MOST important topic to cover in a risk awareness training p...
Q550. Which of the following is the PRIMARY reason to perform periodic vendor risk assessments?...
Q551. The BEST metric to demonstrate that servers are configured securely is the total number of...
Q552. An organization has recently hired a large number of part-time employees. During the annua...
Q553. Which of the following is the PRIMARY purpose for ensuring senior management understands t...
Q554. The PRIMARY reason to have risk owners assigned to entries in the risk register is to ensu...
Q555. IT stakeholders have asked a risk practitioner for IT risk profile reports associated with...
Q556. Which of the following BEST indicates the risk appetite and tolerance level (or the risk a...
Q557. An organization is implementing internet of Things (loT) technology to control temperature...
Q558. The effectiveness of a control has decreased. What is the MOST likely effect on the associ...
Q559. Which of the following should be the FIRST step when a company is made aware of new regula...
Q560. When performing a risk assessment of a new service to support a ewe Business process. whic...
Q561. An organization plans to migrate sensitive information to a public cloud infrastructure. W...
Q562. The PRIMARY benefit of conducting continuous monitoring of access controls is the ability ...
Q563. Which of the following statements in an organization's current risk profile report is caus...
Q564. While conducting an organization-wide risk assessment, it is noted that many of the inform...
Q565. Which of the following is the MOST effective way to integrate business risk management wit...
Q566. Which of the following is the BEST indicator of the effectiveness of IT risk management pr...
Q567. The acceptance of control costs that exceed risk exposure is MOST likely an example of:...
Q568. From a risk management perspective, which of the following is the PRIMARY benefit of using...
Q569. Which of the following provides the BEST evidence of the effectiveness of an organization'...
Q570. Who is ULTIMATELY accountable for risk treatment?...
Q571. Which of the following deficiencies identified during a review of an organization's cybers...
Q572. An application runs a scheduled job that compiles financial data from multiple business sy...
Q573. An organization must make a choice among multiple options to respond to a risk. The stakeh...
Q574. An organization has identified that terminated employee accounts are not disabled or delet...
Q575. An organization's senior management is considering whether to acquire cyber insurance. Whi...
Q576. Which of the following is the PRIMARY reason for a risk practitioner to report changes and...
Q577. Which of the following should be the PRIMARY input when designing IT controls?...
Q578. An organization has experienced several incidents of extended network outages that have ex...
Q579. A risk practitioner recently discovered that personal information from the production envi...
Q580. When developing a response plan to address security incidents regarding sensitive data los...
Q581. Which of the following is the MOST important benefit of reporting risk assessment results ...
Q582. Which of the following provides the BEST evidence that a selected risk treatment plan is e...
Q583. The software version of an enterprise's critical business application has reached end-of-l...
Q584. Which of the following data would be used when performing a business impact analysis (BIA)...
Q585. The BEST way to obtain senior management support for investment in a control implementatio...
Q586. Which of the following is the MOST important responsibility of a risk owner?...
Q587. Which of the following is the PRIMARY reason to update a risk register with risk assessmen...
Q588. Which of the following would MOST likely cause a risk practitioner to change the likelihoo...
Q589. Which organizational role should be accountable for ensuring information assets are approp...
Q590. Vulnerabilities have been detected on an organization's systems. Applications installed on...
Q591. The design of procedures to prevent fraudulent transactions within an enterprise resource ...
Q592. Which of the following is a risk practitioner's BEST recommendation to address an organiza...
Q593. Which of the following is MOST important for a risk practitioner to consider when determin...
Q594. Reviewing which of the following would provide the MOST useful information when preparing ...
Q595. Which of the following facilitates a completely independent review of test results for eva...
Q596. To minimize the risk of a potential acquisition being exposed externally, an organization ...
Q597. Which of the following roles should be assigned accountability for monitoring risk levels?...
Q598. Which of the following is the BEST method for assessing control effectiveness against tech...
Q599. Which of the following should be the PRIMARY consideration when assessing the risk of usin...
Q600. Which of the following is the MOST effective way to incorporate stakeholder concerns when ...
Q601. Which of the following statements BEST illustrates the relationship between key performanc...
Q602. The PRIMARY reason for communicating risk assessment results to data owners is to enable t...
Q603. Which of the following will BEST help to ensure that information system controls are effec...
Q604. Which of the following would MOST likely result in updates to an IT risk appetite statemen...
Q605. Which of the following is the BEST recommendation to senior management when the results of...
Q606. During the risk assessment of an organization that processes credit cards, a number of exi...
Q607. Which of the following is the GREATEST risk associated with an environment that lacks docu...
Q608. Which of the following is the PRIMARY reason for sharing risk assessment reports with seni...
Q609. Which of the following would provide the BEST guidance when selecting an appropriate risk ...
Q610. During a post-implementation review for a new system, users voiced concerns about missing ...
Q611. Which of the following is the MOST important input when developing risk scenarios?...
Q612. An IT operations team implements disaster recovery controls based on decisions from applic...
Q613. An internal audit report reveals that a legacy system is no longer supported Which of the ...
Q614. A business impact analysis (BIA) has documented the duration of maximum allowable outage f...
Q615. Risk management strategies are PRIMARILY adopted to:...
Q616. Who is the BEST person to an application system used to process employee personal data?...
Q617. Which of the following is the MOST important consideration when sharing risk management up...
Q618. An organization has outsourced its backup and recovery procedures to a third-party cloud p...
Q619. Which of the following is the MOST common concern associated with outsourcing to a service...
Q620. Which of the following should be the MAIN consideration when validating an organization's ...
Q621. Which of the following is the GREATEST benefit of identifying appropriate risk owners?...
Q622. Which of the following is the BEST response when a potential IT control deficiency has bee...
Q623. A newly hired risk practitioner finds that the risk register has not been updated in the p...
Q624. An organization's risk register contains a large volume of risk scenarios that senior mana...
Q625. An organization planning to transfer and store its customer data with an offshore cloud se...
Q626. After the review of a risk record, internal audit questioned why the risk was lowered from...
Q627. Which of the following is the BEST key performance indicator (KPI) for a server patch mana...
Q628. Which of the following is MOST important to promoting a risk-aware culture?...
Q629. When establishing an enterprise IT risk management program, it is MOST important to:...
Q630. Which of the following is the MOST important objective from a cost perspective for conside...
Q631. Which of the following should a risk practitioner do NEXT after learning that Internet of ...
Q632. A risk practitioner has determined that a key control does not meet design expectations. W...
Q633. Which of the following is the MOST important consideration when developing an organization...
Q634. Which of the following risk management practices BEST facilitates the incorporation of IT ...
Q635. Which of the following is the MOST important data source for monitoring key risk indicator...
Q636. What is senior management's role in the RACI model when tasked with reviewing monthly stat...
Q637. A recent risk workshop has identified risk owners and responses for newly identified risk ...
Q638. A risk practitioner has just learned about new done FIRST?...
Q639. Which of the following should be the PRIMARY objective of a risk awareness training progra...
Q640. A risk practitioner has identified that the agreed recovery time objective (RTO) with a So...
Q641. Senior management has requested more information regarding the risk associated with introd...
Q642. Which of the following is MOST important to update following a change in organizational ri...
Q643. Which of the following is the BEST indicator of an effective IT security awareness program...
Q644. The MAIN purpose of reviewing a control after implementation is to validate that the contr...
Q645. Which of the following will help ensure the elective decision-making of an IT risk managem...
Q646. Which of the following should be determined FIRST when a new security vulnerability is mad...
Q647. Which of the following is the MOST important requirement for monitoring key risk indicator...
Q648. Which of the following is BEST measured by key control indicators (KCIs)?...
Q649. Which of the following should be of GREATEST concern lo a risk practitioner reviewing the ...
Q650. Which of the following is the MOST important reason to validate that risk responses have b...
Q651. Which of the following is the BEST way for a risk practitioner to present an annual risk m...
Q652. An organization is considering adopting artificial intelligence (AI). Which of the followi...
Q653. The GREATEST concern when maintaining a risk register is that:...
Q654. Which of the following is MOST important when developing risk scenarios?...
Q655. After migrating a key financial system to a new provider, it was discovered that a develop...
Q656. The BEST use of key risk indicators (KRIs) is to provide:...
Q657. Which of the following is the BEST indication that key risk indicators (KRls) should be re...
Q658. All business units within an organization have the same risk response plan for creating lo...
Q659. A risk practitioner discovers several key documents detailing the design of a product curr...
Q660. Performing a background check on a new employee candidate before hiring is an example of w...
Q661. Business areas within an organization have engaged various cloud service providers directl...
Q662. An organization is considering allowing users to access company data from their personal d...
Q663. An external security audit has reported multiple findings related to control noncompliance...
[×]

Download PDF File

Enter your email address to download ISACA.CRISC.v2025-06-16.q663.pdf

Email:

DumpsFiles

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 DumpsFiles

www.dumpsfiles.com materials do not contain actual questions and answers from Cisco's certification exams.