On pipelines, which coating is identifiable by its distinct colors, usually light blue, green, or grey?
Correct Answer: B
Add Comments
- Other Question (33q)
- Q1. On pipelines, which coating is identifiable by its distinct colors, usually light blue, gr...
- Q2. When using a destructive Paint Inspection Gauge the NACE inspector must:...
- Q3. Thermal Spray coatings provide:
- Q4. Which standards are generally established by private-sector bodies and are available for u...
- Q5. You are the new NACE Level 2 Inspector on a job which had been very problematic. The previ...
- Q6. You are working as an inspector in a galvanizing plant for the first time. What are some o...
- Q7. Linings are used on the interior of pipelines to...
- Q8. You are the NACE Level 2 inspector reviewing the documentation from a NACE Level 1 you not...
- Q9. Inspector reports should always be copied to:
- Q10. NACE/SSPC Water Jetting standards are directly equivalent to ISO Abrasive Blast Standards:...
- Q11. Dehumidification is defined as the removal of moisture vapor from the air to...
- Q12. You are NACE Level 2 Inspector working on a tank lining job where a mobile centrifugal bla...
- Q13. You are working as the only in-house NACE Level 2 Inspector in a shop setting when an inde...
- Q14. When performing inspection in accordance with ASTM D 4138 the Inspector will use:...
- Q15. All of these are advantages of using repair patches EXCEPT...
- Q16. Individuals conducting Coating Surveys should:...
- Q17. You are a NACE Level 2 in-house inspector working in a shop. Your in-house requires you to...
- Q18. NACE Standards include:
- Q19. You have just your NACE CIP Level 2 certification when you are asked to supervise a team o...
- Q20. In the event of a conflict between the Product Data Sheet and the Specification:...
- Q21. The solvent sensitivity/solvent wipe test (ASTM D4752) is used to determine the cure of...
- Q22. The Concrete Repair Institute's comparators can be used to assess:...
- Q23. Cold-applied tape
- Q24. The cost of qualified Coating Inspection is normally offset by:...
- Q25. Non-Conformance Reports are designed to:
- Q26. In powder coatings, when the particles of powder begin to flow but are not fully liquid, t...
- Q27. Eddy current DFT gauges are used to measure Dry Film Thickness in which of the following s...
- Q28. An Inspection and Test Plan is required when:
- Q29. Which type of pipelines collect the gas from the transmission system so utility companies ...
- Q30. NACE International Standards are developed by:...
- Q31. Differences in technique for abrasive blasting concrete versus steel require the operator ...
- Q32. Coating Surveys are legally required:
- Q33. Ideally, documentation requirements should be defined:...