DumpsFiles
 Request Exam  Contact
  • Home
  • PRACTICE EXAMS
    Oracle
    Fortinet
    Juniper
    Microsoft
    Cisco
    Citrix
    CompTIA
    VMware
    SAP
    EMC
    PMI
    HP
    Salesforce
    Other
  • View All Exams
  • New Dumps Files
  • Upload
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. PRINCE2
  3. PRINCE2 Practitioner Exam
  4. PRINCE2.PRINCE2-Practitioner.v2023-08-01.q264
  5. Question 1

Join the discussion

Question 1/264

Which of the following represents the four key characteristics a good Project board should display?

Correct Answer: A

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.
Rating:
Other Question (264q)
Q1. Which of the following represents the four key characteristics a good Project board should...
Q2. CLOSING A PROJECT Benefits relating to income and business reputation after the project ha...
Q3. Which product should show that the photos could be used for other promotional material for...
Q4. Product based planning focuses on which of the following: 1.Creating product descriptions ...
Q5. Using the Project Scenario and the Extract from Stage Plan for stage 3 provided as additio...
Q6. Which of the following roles cannot be combined?...
Q7. The service level agreement contains a number of technical terms that are missing from its...
Q8. The project is part of a program to increase the number of ABC courses that respond to leg...
Q9. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q10. Which 2 statements apply to either the Techniques, processes and procedures or Constraints...
Q11. Which 2 statements apply to the Composition section?...
Q12. The project's change control approach states that PRINCE2's recommended issue and change c...
Q13. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q14. HOTSPOT Scenario A photographer from Portraits Ltd, a professional photographic company, h...
Q15. During stage 3, the operational staff that handle course bookings asked for the project sc...
Q16. Which 2 statements correctly define a Business Case risk which should be recorded under th...
Q17. Which of the following activities is NOT an action of preparing for planned closure?...
Q18. Which statement is an appropriate entry for the project approach heading within the Projec...
Q19. Which statement applies to the Introduction section?...
Q20. Whilst identifying the mailing costs for the calendars the Project Manager was surprised t...
Q21. Scenario Additional Information During the initiation stage the Project Manager met with t...
Q22. While deciding on how the work of the project should be approached the following were cons...
Q23. HOTSPOT Scenario: Techniques, processes and procedures 1. Any threat that may result in a ...
Q24. Scenario A central government department, the Ministry of Food Hygiene (MFH), faces increa...
Q25. Additional Information A photographer from Portraits Ltd, a professional photographic comp...
Q26. Additional Information Product Description (Exhibit) Quality notes from the Daily Log The ...
Q27. Which 2 statements apply to the Development skills required section?...
Q28. The 'classroom-based training materials' will be used as the basis for developing the 'e-l...
Q29. Which statement is an appropriate entry for the Lessons Log?...
Q30. Which 2 alternative actions apply to the proposed business assurance for this project?...
Q31. The project is now in stage 2. The Project Manager has heard about the possibility of a co...
Q32. Which of the following management products ARE updated as part of Managing a stage boundar...
Q33. The project is approaching the end of stage 4 and all work will be completed as planned. T...
Q34. HOTSPOT Extract from the Project Product Description (with errors) (Exhibit) Column 1 is a...
Q35. Scenario Product Summary A list of customers will be collated. This will use existing info...
Q36. Starting Up a project is triggered by which of the following?...
Q37. Using the Project Scenario and the Extract from Stage Plan for stage 3 provided as additio...
Q38. Which statement applies to the Introduction section?...
Q39. Additional Information Chief Executive Officer (CEO): He started the company 25 years ago ...
Q40. Towards the end of stage 2, the stage 3 plan is being prepared. This includes the work req...
Q41. Scenario Additional Information (Exhibit) Further information on some resources who could ...
Q42. Scenario A central government department, the Ministry of Food Hygiene (MFH), faces increa...
Q43. Which 2 statements apply to either the Extracts or references or Approval method sections?...
Q44. Scenario A photographer from Portraits Ltd, a professional photographic company, has taken...
Q45. Which of the following roles cannot be combined?...
Q46. The project is now in stage 2. The Project Manager has heard about the possibility of a co...
Q47. Which of the following risk responses can be used for either an opportunity or a threat?...
Q48. Project Scenario Calendar Project (Note: The companies and people within the scenario are ...
Q49. Which 2 alternative actions apply to the proposed user assurance for this project?...
Q50. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q51. Which other management product is created when the Business case is updated during Initiat...
Q52. Which of the following activities is the Executive responsible for?...
Q53. Which 2 statements should be recorded under the Business options heading?...
Q54. HOTSPOT Product Summary A list of customers will be collated. This will use existing infor...
Q55. While preparing the Quality Management Strategy, the Project Manager noticed that the corp...
Q56. Scenario A photographer from Portraits Ltd, a professional photographic company, has taken...
Q57. Which of the following activities is the Executive responsible for?...
Q58. The Work Package has been in progress for four weeks and has four weeks remaining. The Inf...
Q59. While preparing the Risk Management Strategy, the Project Manager considered the commercia...
Q60. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q61. The project is now closed. The expected increase in revenue is not being achieved. It has ...
Q62. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q63. Which of the following statements are True: 1. Quality management is the complete set of q...
Q64. Scenario Additional Information During the initiation stage the Project Manager met with t...
Q65. Scenario: Techniques, processes and procedures 1. Any threat that may result in a loss of ...
Q66. Which of the following reports does not contain any information on risk?...
Q67. Scenario A central government department, the Ministry of Food Hygiene (MFH), faces increa...
Q68. Scenario: Techniques, processes and procedures 1. Any threat that may result in a loss of ...
Q69. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q70. Which of the following statements is true of the business interest on the project?...
Q71. Scenario Additional Information (Exhibit) Further information on some resources who could ...
Q72. Which of the following statements best describes what a risk owner is?...
Q73. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q74. The change control approach defines how products should be controlled and protected during...
Q75. Two weeks after starting work the Team Manager noticed that each completed product had exc...
Q76. A change authority has been appointed for the project. During the development of the 'clas...
Q77. This question provides a number of changes which may or may not be required to the Extract...
Q78. Using the Project Scenario and the Extract from Stage Plan for stage 3 provided as additio...
Q79. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q80. Based on lessons from previous projects that used the ABC Company standard development mod...
Q81. Additional Information Chief Executive Officer (CEO): He started the company 25 years ago ...
Q82. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q83. During which of the following activities is the Project Product Description created?...
Q84. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q85. Who is responsible for reviewing the risk management practices to ensure they are in line ...
Q86. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q87. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q88. Scenario Additional Information Product Description (Exhibit) Quality notes from the Daily...
Q89. HOTSPOT Project Scenario Calendar Project (Note: The companies and people within the scena...
Q90. If Project tolerances were threatened, who needs to be notified?...
Q91. The Work Package has been in progress for four weeks and has four weeks remaining. The Inf...
Q92. Although it is not specified in the current corporate branding standards, the MFH corporat...
Q93. During stage 3, the project scope was extended to include a practice test for learners to ...
Q94. Although it is not specified in the current corporate branding standards, the MFH corporat...
Q95. Scenario Product Summary A list of customers will be collated. This will use existing info...
Q96. During previous projects, stakeholders became confused when using a number of separate pro...
Q97. Which 2 statements correctly define a Business Case risk which should be recorded under th...
Q98. Scenario Additional Information Chief Executive Officer (CEO): He started the company 25 y...
Q99. Scenario Additional Information During the initiation stage the Project Manager met with t...
Q100. Which 2 statements apply to either the Reporting arrangements or Problem handling and esca...
Q101. The project is at the start of stage 3, and there will be six teams working on product del...
Q102. Additional Information (Exhibit) Further information on some resources who could be involv...
Q103. Extract from the Project Product Description (with errors) (Exhibit) Column 1 is a list of...
Q104. Which 2 statements apply to the Customer's quality expectations section?...
Q105. Scenario Product Summary A list of customers will be collated. This will use existing info...
Q106. Which of the following statements is False regarding the Risk Management Strategy?...
Q107. Which statement is TRUE with regard to technical stages?...
Q108. The project is now in stage 2. The Project Manager has heard about the possibility of a co...
Q109. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q110. Which 2 statements explain why the Marketing Director should be appointed as the Executive...
Q111. HOTSPOT Scenario: Techniques, processes and procedures 1. Any threat that may result in a ...
Q112. Project Scenario Calendar Project (Note: The companies and people within the scenario are ...
Q113. Who is responsible for ensuring that Communication Management Strategy is appropriate and ...
Q114. ABC Company carried out a similar project two years ago, in response to changes in health ...
Q115. During stage 3, a work package was assigned to produce the 'planned pilot courses'. The pr...
Q116. Scenario Product Summary A list of customers will be collated. This will use existing info...
Q117. The project is now in stage 2. The Project Manager has heard about the possibility of a co...
Q118. According to PRINCE2, which statement about the Configuration Management Strategy for the ...
Q119. The project is at the end of stage 4. The project manager has changed the benefits managem...
Q120. Scenario: Techniques, processes and procedures 1. Any threat that may result in a loss of ...
Q121. HOTSPOT Scenario: Techniques, processes and procedures 1. Any threat that may result in a ...
Q122. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q123. PRINCE2 proposes 3 levels of Plan, which are they?...
Q124. Scenario Additional Information Product Description (Exhibit) Quality notes from the Daily...
Q125. When does Directing a Project begin?
Q126. Which of the following is NOT a trigger for the project manager to authorize a work packag...
Q127. HOTSPOT Extract from the Project Product Description (with errors) (Exhibit) Column 1 is a...
Q128. Based on lessons from previous projects that used the ABC Company standard development mod...
Q129. As the project approaches the end of stage 2, the Project Manager has requested a Product ...
Q130. Which management product defines the detailed nature, purpose and function of a product?...
Q131. What additional risk will this place on the project?...
Q132. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q133. Scenario: Techniques, processes and procedures 1. Any threat that may result in a loss of ...
Q134. Who is responsible for ensuring that the value-for-money solution is constantly reassessed...
Q135. During stage 2, if the Project Manager decides to recommend that the Project Plan is revis...
Q136. Scenario Additional Information During the initiation stage the Project Manager met with t...
Q137. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q138. CLOSING A PROJECT Benefits relating to income and business reputation after the project ha...
Q139. The project is part of a program to increase the number of ABC courses that respond to leg...
Q140. There is no Project Brief. How can there be a common understanding of the desired outcomes...
Q141. MANAGING PRODUCT DELIVERY Stage 2 is in progress. While producing the team plan, the team ...
Q142. Scenario Additional Information (Exhibit) Further information on some resources who could ...
Q143. Which product should show that if anybody has any remaining resource costs to be charged t...
Q144. M1ich statement is an appropriate entry for the outline Business Case heading within the P...
Q145. There is no Project Brief. How can there be a common understanding of the desired outcomes...
Q146. Scenario A photographer from Portraits Ltd, a professional photographic company, has taken...
Q147. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q148. Which of the following risk responses can be used for either an opportunity or a threat?...
Q149. The Team Manager has received notification that the new hardware and software solution has...
Q150. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q151. Additional Information During the initiation stage the Project Manager met with the Market...
Q152. Which statement is an appropriate entry for the Initiation Stage Plan?...
Q153. The project's change control approach states that PRINCE2's recommended issue and change c...
Q154. Which product should show that the staff photo sessions were disruptive to the Engineering...
Q155. HOTSPOT Additional Information Chief Executive Officer (CEO): He started the company 25 ye...
Q156. HOTSPOT The project has a cost tolerance of +5% I 5%, of which stage 2 has a tolerance of ...
Q157. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q158. Which of the following statements describes an outcome?...
Q159. In order for ABC Company to achieve the expected sales of the health and safety training c...
Q160. Who is responsible for committing user resources to the project?...
Q161. The project is now closed. The expected increase in revenue is not being achieved. It has ...
Q162. Additional Information Product Description (Exhibit) Quality notes from the Daily Log The ...
Q163. A central government department, the Ministry of Food Hygiene (MFH), faces increasing pres...
Q164. Scenario Additional Information Product Description (Exhibit) Quality notes from the Daily...
Q165. Which is a correctly defined acceptance criterion for the service level agreement (SLA) wi...
Q166. Which 2 statements apply to the Customer's quality expectations section?...
Q167. It is now late October and the project is in stage 3. The label design competition has bee...
Q168. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q169. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q170. In which strategy would the change control process be recorded?...
Q171. Who is responsible for confirming stage and project progress against agreed tolerances?...
Q172. Scenario Additional Information Chief Executive Officer (CEO): He started the company 25 y...
Q173. Scenario Additional Information Product Description (Exhibit) Quality notes from the Daily...
Q174. Which 2 statements should be recorded under the Major risks heading?...
Q175. Which is a correctly defined acceptance criterion for the transferred staff?...
Q176. Scenario Extract from the Project Product Description (with errors) (Exhibit) Which 2 stat...
Q177. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q178. HOTSPOT The Calendar project was delivered as originally planned, and Is now preparing for...
Q179. At the end of stage 2, the specialist 'e-learning course' supplier will be selected. As a ...
Q180. Which of the following statements is False regarding the Risk Management Strategy?...
Q181. CONTROLLING A STAGE During stage 4, an issue was raised by an ABC trainer that the 'classr...
Q182. Extract from the Project Product Description (with errors) (Exhibit) Which 2 statements ap...
Q183. All the products that are due in stage 3 have been completed, apart from the 'updated corp...
Q184. HOTSPOT Additional Information A photographer from Portraits Ltd, a professional photograp...
Q185. When considering the business options in the business case, which of these is NOT an optio...
Q186. Which of the following statements is NOT correct? The Learn from Experience principle sugg...
Q187. Scenario Additional Information Product Description (Exhibit) Quality notes from the Daily...
Q188. Project Scenario Calendar Project (Note: The companies and people within the scenario are ...
Q189. During stage 2, if the Project Manager decides to recommend that the Project Plan is revis...
Q190. Which statement best explains the purpose of Tailor to suit the project environment?...
Q191. HOTSPOT A photographer from Portraits Ltd, a professional photographic company, has taken ...
Q192. Which product should register that the risk of a competitor producing a calendar at the sa...
Q193. Extract from the Project Product Description (with errors) (Exhibit) Which 2 statements ap...
Q194. Which 2 statements should be recorded under the Expected dis-benefits heading?...
Q195. The project is approaching the end of stage 3, and stage 4 is being planned as part of the...
Q196. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q197. Scenario: The Ministry of Food Hygiene (MFH) has a quality management system which contain...
Q198. Additional Information Extract from the Communication Management Strategy. The project inf...
Q199. Scenario A photographer from Portraits Ltd, a professional photographic company, has taken...
Q200. There are two time driven controls in PRINCE2, which are they?...
Q201. Which statement is an appropriate entry for the Initiation Stage Plan?...
Q202. Which principle is supported by the activity Evaluate the Project?...
Q203. The Health and Safety Training Project is part of a programme of strategic expansion, whic...
Q204. The Manage by Exception principle sets tolerances for six areas of the project, Time. Cost...
Q205. Which management product do the Project Board use to decide whether to authorize initiatio...
Q206. Additional Information Product Description (Exhibit) Quality notes from the Daily Log The ...
Q207. Which other management product is created when the Business case is updated during Initiat...
Q208. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q209. During stage 2, an early review of the photo design ideas from the Marketing department ha...
Q210. After preparing the stage 3 plan, the project manager left the company. The project board ...
Q211. Scenario Product Summary A list of customers will be collated. This will use existing info...
Q212. The delivery of the pilot courses has been split into two separate products: 'planned pilo...
Q213. HOTSPOT Scenario Additional Information During the initiation stage the Project Manager me...
Q214. Additional Information Extract from the Communication Management Strategy. The project inf...
Q215. The Calendar project was delivered as originally planned, and Is now preparing for planned...
Q216. It is now late October and the project is in stage 3. The label design competition has bee...
Q217. Two weeks after starting work the Team Manager noticed that each completed product had exc...
Q218. Which of the following statements are True: 1. Quality management is the complete set of q...
Q219. Which 2 statements should be recorded under the Expected dis-benefits heading?...
Q220. Who is responsible for committing user resources to the project?...
Q221. Based on lessons from previous projects that used the ABC Company standard development mod...
Q222. The project is in stage 2. The project manager is reviewing stage status and has collected...
Q223. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q224. Scenario Additional Information During the initiation stage the Project Manager met with t...
Q225. Who is responsible for committing user resources to the project?...
Q226. Scenario Additional Information Extract from the Communication Management Strategy. The pr...
Q227. Which 2 alternative actions apply to the proposed user assurance for this project?...
Q228. Scenario A central government department, the Ministry of Food Hygiene (MFH), faces increa...
Q229. Which of the following should NOT be included in the business case?...
Q230. Who is responsible for confirming stage and project progress against agreed tolerances?...
Q231. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q232. Whilst identifying the mailing costs for the calendars the Project Manager was surprised t...
Q233. Which 2 alternative actions apply to the proposed Senior User for this project?...
Q234. Which statement applies to the Quality standards section?...
Q235. Additional Information Chief Executive Officer (CEO): He started the company 25 years ago ...
Q236. Scenario Additional Information (Exhibit) Further information on some resources who could ...
Q237. Additional Information Extract from the Communication Management Strategy. The project inf...
Q238. MANAGING PRODUCT DELIVERY Stage 2 is in progress. While producing the team plan, the team ...
Q239. MANAGING A STAGE BOUNDARY The ABC Company trainers have been accredited and the course boo...
Q240. Scenario Additional Information Product Description (Exhibit) Quality notes from the Daily...
Q241. Which of the following principles describes this statement? "xxx defines tolerances for ea...
Q242. During stage 3, the project scope was extended to include a practice test for learners to ...
Q243. The team member collating the list of customers has now forecast that it will NOT be compl...
Q244. Scenario A central government department, the Ministry of Food Hygiene (MFH), faces increa...
Q245. INITIATING A PROJECT Here are three items of information relating to the 'initiating a pro...
Q246. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q247. Scenario Additional Information Chief Executive Officer (CEO): He started the company 25 y...
Q248. Which of the following statements is true of the business interest on the project?...
Q249. Which principle is central to the quality theme and provides explicit understanding of wha...
Q250. The development of the 'e-learning course' will be outsourced to an external supplier and ...
Q251. Project Scenario - Health and Safety Training Project: ABC Company is a well-established t...
Q252. The project is in stage 2. The project manager is reviewing stage status and has collected...
Q253. Additional Information (Exhibit) Further information on some resources who could be involv...
Q254. The project is now in stage 2. The Project Manager has heard about the possibility of a co...
Q255. Scenario Additional Information Chief Executive Officer (CEO): He started the company 25 y...
Q256. Having completed designing the plan, in which order should the next steps take place to pr...
Q257. Which of the following statements is FALSE regarding the Continued Business Justification?...
Q258. The external team manager for the 'e-learning course' has reviewed the quality register to...
Q259. While preparing the Configuration Management Strategy, the Project Manager considered the ...
Q260. HOTSPOT Drop down the right answer from Column 1 to column 2. Hot Area: (Exhibit)...
Q261. Who would be responsible for maintaining the Configuration Item Records?...
Q262. The project is approaching the end of stage 3, and stage 4 is being planned as part of the...
Q263. While deciding on how the work of the project should be approached the following were cons...
Q264. The 'classroom-based training materials' will be used as the basis for developing the 'e-l...
[×]

Download PDF File

Enter your email address to download PRINCE2.PRINCE2-Practitioner.v2023-08-01.q264.pdf

Email:

DumpsFiles

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2025 DumpsFiles

www.dumpsfiles.com materials do not contain actual questions and answers from Cisco's certification exams.