Question 44/50
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.
There are 3 correct answers to this question.
Correct Answer: A,B,C
Add Comments
- Other Question (50q)
- Q1. What are the consequences when you assign a planned order to a production line manually, u...
- Q2. When do you use variant bills of materials (BOMB)?...
- Q3. Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 c...
- Q4. What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers...
- Q5. Which actions does the system perform by default when you save aconfirmation for a finishe...
- Q6. What is the first step in the MRP run?
- Q7. In which data objects do you maintain the production line as the work center for repetitiv...
- Q8. Which material master setting is required to use the repetitive planning table for product...
- Q9. What are the possible categories for the Business Partner master data object in SAP S/4HAN...
- Q10. In which customizing activity do you set up automatic routing selection production orders?...
- Q11. What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS? There are...
- Q12. For a production version to be valid and consistent what requirements must be fulfilled? N...
- Q13. Where can you find the latest in version of the Simplification List for SAP S/4HANA? Pleas...
- Q14. For a production version to be valid and consistent what requirements must be fulfilled? N...
- Q15. A customer is considering switching from order-related settlement to productrelated settle...
- Q16. What are some uses for the low-level code assigned to each material? Note: There are 2corr...
- Q17. Which of the following elements does MRP take into account during net requirement calculat...
- Q18. Your quality department detects a deviation in a raw material batch. Unfortunately, this b...
- Q19. What are properties of MRP Live? There are 2 correct answers to this question....
- Q20. What are the possible results of a production planning run inAdvanced Planning (PP/OS)? No...
- Q21. In which of the following master data objects can you define the production order default ...
- Q22. Where does the system check master data selection settings during the creation of planned ...
- Q23. What are the three layers in the SAP Best Practices Content for SAP S/4HANA? There are 3 c...
- Q24. What are prerequisites for using batch derivation? There are 2 correct answers to this que...
- Q25. When working with both cross-plant and plant-specific material statuses in the mater al ma...
- Q26. How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning ...
- Q27. When can the material availability check occur automatically in a production order? Note: ...
- Q28. How can you achieve a feasible production plan in case of capacity constraints? Note: Ther...
- Q29. Your company produces a finished good based on a forecast and expects it to being stock wh...
- Q30. You want to create a production order from a planned order. What methods could you use? No...
- Q31. Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4H...
- Q32. You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in...
- Q33. Duringproduction order creation, several valid production versions are found. How does the...
- Q34. You want to schedule an order in the graphical planning board. What are valid planning dir...
- Q35. How would you define pegging in the context of Advanced Planning?...
- Q36. Advanced Planning is delivered with standard out-of-the-box order and resource evaluations...
- Q37. The MRP run detected a shortage of a material that you source from an external supplier in...
- Q38. In your project,you have several materials that are planned by different people. How can y...
- Q39. You want to schedule an operation finitely, without moving other operations. Which schedul...
- Q40. Your client is asking for your advice on material master numbering in SAP S/4HANA. What do...
- Q41. Which options are available for an SAP S/4HANA deployment? There are 2 correct answers to ...
- Q42. You want to perform capacity availability checks on your production orders. What must be s...
- Q43. Which of the following processes lead to an entry in the MRP planning file? Note: There ar...
- Q44. Which technological advances enabled the development of SAP S/4HANA as the digital core? T...
- Q45. MRP created a planned order for a material that has one single material from stock as a co...
- Q46. A planner wants to interactively resolve an overload situation on a resource using advance...
- Q47. If you use floats to limit dispatching in capacity planning, what type of time element can...
- Q48. You want to set up a make-to-order planning scenario for a finished material. Some compone...
- Q49. What Kanban status automatically posts goods receipt with reference to the procurement ele...
- Q50. Which of the following is an advantage of MRP Live and NOT available in classical MRP? The...