Question 1/27
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?
Correct Answer: B,D
Add Comments
- Other Question (27q)
- Q1. You need to model goods receipt processing time in detailed scheduling. Whic modeling opti...
- Q2. You have a schedule agreement whit a vendor. You want classic MRP to automatically create ...
- Q3. Your client is asking for your advice on material master numbering in SAP S/4HANA. What do...
- Q4. Which time elements are relevant for lead time scheduling of a production order?...
- Q5. Where do you maintain the work center that represents the production line for repetitive m...
- Q6. Your proyect team decides to use a make-to-order planning strategy for strategic in discre...
- Q7. You want to insert an operatio at a certain time on work center. The planning direction is...
- Q8. What does forecasting in demand planning cycle include?...
- Q9. When working with bouth cross-plant and plant-specific material statuses n the material ma...
- Q10. What is a work center hierarchy in planning in SAP S/4HANA?...
- Q11. Which materials have a negative quantity in a bill of materials or in a recipe?...
- Q12. Which times elements does MRP consider in backward scheduling to determine he order dates ...
- Q13. Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data ob...
- Q14. What detremines whatherthe planned independent requirements in MRP are consumed by other r...
- Q15. Why would you use phantom assemblies?
- Q16. What are some uses for the low-level code assigned to each material?...
- Q17. Which of the following is valid sequence of the main activities in production order proces...
- Q18. How would you define pegging in the context of Advanced Planning?...
- Q19. You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in...
- Q20. When can the automatic material availability check occur in a production order?...
- Q21. How can you achive a feasible production plan in case of capacity constraints?...
- Q22. You have maintained the parameters for simple discontinuation in the material master of a ...
- Q23. What is the purpose of collective orders?
- Q24. Which options do you have to plan both quant ties and capacities during line loading in re...
- Q25. You are working with planning strategy 40 (Planning-with-final assembly) When does consupt...
- Q26. You set up a material as a phantom assembly by entering the special procurement key in the...
- Q27. Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4H...