Question 7/32
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?
Note: There are 2 correct answers to this question.
Note: There are 2 correct answers to this question.
Correct Answer: A,C
Add Comments
- Other Question (32q)
- Q1. What is a prerequisite for consumption of planned independent requirements to take place f...
- Q2. You want to use capacity availability checks for production orders. Which settings have to...
- Q3. Which options do you have to plan both quantities capacities during line loading in repeti...
- Q4. You want to set up a maketoorder planning scenario for a finished product. The bill of mat...
- Q5. Advanced Planning is delivered with standard out-of-the-box order and resource evaluations...
- Q6. How would you define pegging in the context of Advanced Planning?...
- Q7. Which of the following questions do you have to answer before you start creating a bill of...
- Q8. What are the prerequisites for a reporting point confirmation in repetitive manufacturing?...
- Q9. You run MRP for a material that was planned using Demand-Driven Replenishment. Towards whi...
- Q10. What are some SAP recommended guiding principles to achieve clean core operations? Note: T...
- Q11. Your company manufactures materials whose characteristics differ for each manufacturing pr...
- Q12. What information do you have to maintain to define the relationship between supply source ...
- Q13. How can a material availability check be triggered automatically for a production order? N...
- Q14. Which of the following processes lead to an entry in the MRP planning file? Note: There ar...
- Q15. What generates capacity requirements in a process order? Please choose the correct answer....
- Q16. What could be the reason for multiple commitments where several operations have the same s...
- Q17. What does a line hierarchy in repetitive manufacturing represent?...
- Q18. You want to trigger inhouse production of a semifinished material before a sales order for...
- Q19. What are some benefits of planning with planned independent requirements for finished mate...
- Q20. Which stard item categories can you select inside a bill of material (BOM)? Note: There ar...
- Q21. You are creating a production order manually. What activities are involved in this process...
- Q22. What are the advantages of collective orders? Note: There are 2 correct answers to this qu...
- Q23. How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answ...
- Q24. Which supply chain planning components can you find in SAP S/4HANA? There are 2 correct an...
- Q25. What options does a planner have in the planning table for repetitive manufacturing? Note:...
- Q26. Which time elements does MRP consider in backward scheduling to determine the basic dates ...
- Q27. Why do you use Engineering Change Management? Note: There are 2 correct answers to this qu...
- Q28. Which transaction code can you use in SAP S/4HANA to enter and display goods movements? Pl...
- Q29. You have a scheduling agreement with a vendor. You want classic MRP to automatically creat...
- Q30. Which operations are considered in the capacity scheduling table? Note: There are 2 correc...
- Q31. Which material master data can you copy when you use the Copy Material program (transactio...
- Q32. What are the options if the Dispatched operation status is set for a production order oper...