In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
Correct Answer: C,D,E
Add Comments
- Other Question (29q)
- Q1. In the Capacity Scheduling Table, which settings can you select for the planning strategy?...
- Q2. You set up a material as a phantom assembly by entering the special procurement key in the...
- Q3. What is a work center hierarchy in planning in SAP S/4HANA?...
- Q4. Where do you maintain the work center that represents the production line for repetitive m...
- Q5. Which SAP application can be used for forcasting in Supply Chain Planning?...
- Q6. Which time elements are part of a routing operation?...
- Q7. Which of the following questions do you have to answer before you start creating a BOM?...
- Q8. You want to insert an operatio at a certain time on work center. The planning direction is...
- Q9. Which item statuses can you select inside a material BOM?...
- Q10. What are the consequences when you assgn a planned order to a production line manually, us...
- Q11. Which of the following elements does MRP take into account during net requirement calculat...
- Q12. What type of time element can be reduced by strategy settings while dispatching?...
- Q13. Which options do you have to plan both quant ties and capacities during line loading in re...
- Q14. You have a schedule agreement whit a vendor. You want classic MRP to automatically create ...
- Q15. What are some uses for the low-level code assigned to each material?...
- Q16. How can you achive a feasible production plan in case of capacity constraints?...
- Q17. Your quality department detect a deviation in a raw material batch. Unfortunately, this ba...
- Q18. You want to create a production order from a planned order. What methods could you use?...
- Q19. You want to reduce planning efforts for B/C materials. Which planning procedure do you rec...
- Q20. Your production planners must execute planning only for specific resources. How can you ac...
- Q21. Where do you maintain data to determine the duration of an operation for production?...
- Q22. If the stock level drops below the reorder stock in reorder point planning, what logic wou...
- Q23. You need to model goods receipt processing time in detailed scheduling. Whic modeling opti...
- Q24. You are working with planning strategy 40 (Planning-with-final assembly) When does consupt...
- Q25. Your project used process orders for the production of liquid chemicals. What can you defi...
- Q26. You have maintained the parameters for simple discontinuation in the material master of a ...
- Q27. How can SAP S/4HANA support a GMP-compliant production process?...
- Q28. For which categories can you define BOMs in SAP S/4HANA?...
- Q29. What are the possible results of a production planning run in Advanced Planning (PP/DS)?...