Join the discussion
Question 1/29
Which of the following elements does MRP take into account during net requirement calculation?
Correct Answer: B,C
Add Comments
- Other Question (29q)
- Q1. Which of the following elements does MRP take into account during net requirement calculat...
- Q2. During production order creation, several valid production versions are found. How does th...
- Q3. What is the purpose of collective orders?
- Q4. Which SAP application can be used for forcasting in Supply Chain Planning?...
- Q5. Your quality department detect a deviation in a raw material batch. Unfortunately, this ba...
- Q6. You set up a material as a phantom assembly by entering the special procurement key in the...
- Q7. Your project used process orders for the production of liquid chemicals. What can you defi...
- Q8. You use planning strategy Finite Scheduling - with Reverse adn want to allow scheduling in...
- Q9. You want to schedule an operation finitely, without moving other operations. Which schedui...
- Q10. You want to insert an operatio at a certain time on work center. The planning direction is...
- Q11. For which categories can you define BOMs in SAP S/4HANA?...
- Q12. In the Schedule Production app which setting can you make for the planning strategy?...
- Q13. What type of time element can be reduced by strategy settings while dispatching?...
- Q14. An issue storage location was NOT found through the work center, bill of material(BOM) ite...
- Q15. Which actions does the system preform by default when you save a confirmation for a finish...
- Q16. Which time elements are part of a routing operation?...
- Q17. What detremines whatherthe planned independent requirements in MRP are consumed by other r...
- Q18. Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4H...
- Q19. What does forecasting in demand planning cycle include?...
- Q20. Where do you maintain data to determine the duration of an operation for production?...
- Q21. If the stock level drops below the reorder stock in reorder point planning, what logic wou...
- Q22. Which item statuses can you select inside a material BOM?...
- Q23. How would you define pegging in the context of Advanced Planning?...
- Q24. You have maintained the parameters for simple discontinuation in the material master of a ...
- Q25. Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data ob...
- Q26. Which chart types does the tabular planning table provide in SAP S/4HANA...
- Q27. How can you limit the validity of a bill of material (BOM)?...
- Q28. Which master data object governs the relationship between supply source and demand source ...
- Q29. You want to set up a make-to-order planing scenario for finished material. The bil of mate...
