Why do you use Engineering Change Management? Note: There are 2 correct answers to this question.
Correct Answer: C,D
Engineering Change Management (ECM) in SAP S/4HANA (transaction CC01/CC02) manages changes to objects like BOMs, routings, and materials with a structured process:
* To save multiple changes for an object(C): ECM allows multiple changes (e.g., to a BOM's components) to be grouped under one change number (field: Change Number in CS01). These changes are saved and applied together on a specified date (Valid From), ensuring coordinated updates across objects.
* To monitor document object changes(D): ECM tracks changes to objects (e.g., materials, BOMs) linked to a change number, providing an audit trail (transaction CC03, History tab). This monitors who changed what and when, supporting compliance and traceability.
To monitor document table changes(A) is vague-"document" likely means BOM or routing, but ECM focuses on object changes, not table-level monitoring (e.g., database logs).To enable integration into a sales order(B) is incorrect-ECM integrates with production or procurement, not directly with sales orders (VA01). This is per SAP's ECM functionality.
* To save multiple changes for an object(C): ECM allows multiple changes (e.g., to a BOM's components) to be grouped under one change number (field: Change Number in CS01). These changes are saved and applied together on a specified date (Valid From), ensuring coordinated updates across objects.
* To monitor document object changes(D): ECM tracks changes to objects (e.g., materials, BOMs) linked to a change number, providing an audit trail (transaction CC03, History tab). This monitors who changed what and when, supporting compliance and traceability.
To monitor document table changes(A) is vague-"document" likely means BOM or routing, but ECM focuses on object changes, not table-level monitoring (e.g., database logs).To enable integration into a sales order(B) is incorrect-ECM integrates with production or procurement, not directly with sales orders (VA01). This is per SAP's ECM functionality.
Add Comments
- Other Question (38q)
- Q1. Why do you use Engineering Change Management? Note: There are 2 correct answers to this qu...
- Q2. You want to insert an operation at a certain time on a work center in the graphical planni...
- Q3. Which time elements are part of a routing operation? Note: There are 3 correct answers to ...
- Q4. What is a work center hierarchy?
- Q5. How can you support a GMP (Good Manufacturing Practice) compliant production process? Note...
- Q6. What are the advantages of collective orders? Note: There are 2 correct answers to this qu...
- Q7. What are the possible results of a production planning run in Advanced Planning (PP/DS)? N...
- Q8. What are some SAP-recommended guiding principles to achieve clean core operations? Note: T...
- Q9. What could be the reason for different combinations of components in a multiple bill of ma...
- Q10. Where does the system check master data selection settings during the creation of planned ...
- Q11. Where do you maintain the work center that represents the production line for repetitive m...
- Q12. You have a scheduling agreement with a vendor. You want classic MRP to automatically creat...
- Q13. How would you define pegging in the context of Advanced Planning?...
- Q14. What are the key features of using a low-level code? Note: There are 2 correct answers to ...
- Q15. Which options do you have to plan both quantities and capacities during line loading in re...
- Q16. Which master data fields can have an impact on whether MRP creates planned orders or purch...
- Q17. Your project uses process orders for the production of liquid chemicals. What can you defi...
- Q18. Your company manufactures materials whose characteristics differ for each manufacturing pr...
- Q19. Your production planners are allowed to execute planning only for specific resources. How ...
- Q20. Which information is required when you create a product master in SAP S/4HANA Cloud Privat...
- Q21. What information do you have to maintain to define the relationship between supply source ...
- Q22. How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private E...
- Q23. Your project team decides to use a make-to-order planning strategy for a strategic materia...
- Q24. You have maintained the parameters for simple discontinuation in the material master of a ...
- Q25. Which of the following are possible configuration steps when setting up the alert monitor ...
- Q26. Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There a...
- Q27. What are the options if the Dispatched operation status is set for a production order oper...
- Q28. How are dependent requirements for assemblies created? Note: There are 2 correct answers t...
- Q29. You want to reduce planning efforts for B- and C-classified materials. Which planning proc...
- Q30. Which of the following elements does MRP take into account during net requirement calculat...
- Q31. You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting, the custome...
- Q32. In your plant MRP is activated. Which options do you have to exclude a material from the M...
- Q33. What does a line hierarchy in repetitive manufacturing represent?...
- Q34. You want to use capacity availability checks for production orders. Which settings have to...
- Q35. What will happen in the MRP run if you have created a new MRP-relevant material that suppo...
- Q36. Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA...
- Q37. You want to trigger in-house production of a semi-finished material before a sales order f...
- Q38. Your project team decides to use a make-to-order planning strategy for a strategic materia...