Question 18/53
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
Note: There are 2 correct answers to this question.
Correct Answer: B,C
Add Comments
- Other Question (53q)
- Q1. Which time elements are part of a routing operation? Note: There are 3 correct answers to ...
- Q2. Your quality department detects a deviation in a raw material batch. Unfortunately this ba...
- Q3. How are dependent requirements for assemblies created? Note: There are 2 correct answers t...
- Q4. Where do you maintain the work center that represents the production line for repetitive m...
- Q5. You want to reduce planning efforts for B C classified materials. Which planning procedure...
- Q6. What is the focus of repetitive manufacturing?...
- Q7. What are some benefits of planning with planned independent requirements for finished mate...
- Q8. What are some advantages of using Kanban for material supply? Note: There are 2 correct an...
- Q9. For a production version to be valid and consistent, what requirements must be fulfilled? ...
- Q10. Which planning strategies can you use in the capacity scheduling table? Note: There are 2 ...
- Q11. Which of the following are possible configuration steps when setting up the alert monitor ...
- Q12. What are some options for creating a production order? Note: There are 2 correct answers t...
- Q13. What time element of midpoint scheduled operations can be reduced by reduction strategy se...
- Q14. Which of the following elements does MRP take into account during net requirement calculat...
- Q15. For a production version to be valid consistent what requirements must be fulfilled? Note:...
- Q16. You have maintained the parameters for simple discontinuation in the material master of a ...
- Q17. What happens when you set up detailed scheduling with the finite scheduling mode Insert Op...
- Q18. How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answ...
- Q19. What is the difference between co-products and by-products? Note: There are 2 correct answ...
- Q20. What are the possible results of a production planning run in Advanced Planning (PP/DS)? N...
- Q21. Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data o...
- Q22. How can you set up a material as a phantom assembly? Note: There are 2 correct answers to ...
- Q23. Which of the following questions do you have to answer before you start creating a bill of...
- Q24. When can you maintain the batch characteristic values in SAP S/4HANA? Note: There are 2 co...
- Q25. What determines whether the planned independent requirements in dem management are consume...
- Q26. How can you achieve a feasible production plan when there are capacity constraints? Note: ...
- Q27. What happens when you set up detailed scheduling with the finite scheduling mode Insert Op...
- Q28. For production orders cost object controlling (COC) can be carried out on an order related...
- Q29. Advanced Planning uses master data from SAP S/4HANA Cloud Private Edition. In which data o...
- Q30. Your project team decides to use a maketoorder planning strategy for a strategic material ...
- Q31. When working with the material status, for which business areas can you set a warning mess...
- Q32. Which of the following automation options can you use for production orders? Note: There a...
- Q33. You want to set up a make-to-order planning scenario for a finished product. The bill of m...
- Q34. What are some SAP recommended guiding principles to achieve clean core operations? Note: T...
- Q35. Which of the following are features of the clean core dashboard? Note: There are 2 correct...
- Q36. Mode selection is one of the scheduling options available with Advanced Planning in SAP S/...
- Q37. Under what circumstances can you change the material type for a material if stocks, reserv...
- Q38. What is a prerequisite for the consumption of planned independent requirements to take pla...
- Q39. What will happen in the MRP run if you have created a new MRP-relevant material that suppo...
- Q40. How can you achieve a feasible production plan in case of capacity constraints? Note: Ther...
- Q41. You use the Finite Scheduling - with Reverse planning strategy and want to allow schedulin...
- Q42. Which information is required when you create a product master in SAP S/4HANA Cloud Privat...
- Q43. You want to verify that the properties of a component batch align with the required proper...
- Q44. You are trying to create a production order NO valid production version can be selected. W...
- Q45. Which order type is used for repetitive manufacturing?...
- Q46. What options does a planner have in the planning table for repetitive manufacturing? Note:...
- Q47. Which business processes are affected by settings in the order type dependent parameters? ...
- Q48. Which objects can you change with a change number? Note: There are 2 correct answers to th...
- Q49. How would you define pegging in the context of Advanced Planning?...
- Q50. In the context of the capacity scheduling table, how do you define a pacemaker work center...
- Q51. How can you support a GMP (Good Manufacturing Practice) compliant production process? Note...
- Q52. How are dependent requirements for assemblies created? Note: There are 2 correct answers t...
- Q53. Which of the following questions do you have to answer before you start creating a bill of...