Join the discussion
Question 32/35
You are an inspector on a project where SSPC SP 3 is specified.
What sort of tools should you expect the Contractor to use to achieve the standard?
What sort of tools should you expect the Contractor to use to achieve the standard?
Correct Answer: A
Add Comments
- Other Question (35q)
- Q1. ISO ST 3 is described as:
- Q2. A NACE Coating Inspector is permitted to transport coating material when:...
- Q3. Inspection documentation is important because:...
- Q4. When the joint NACE/SSPC abrasive blast cleaning standards are specified, the pictures in ...
- Q5. You ate the NACE Inspector on a job where NACE No. 2/SSPC - SP 10 has been specified. You ...
- Q6. Digital hygrometers
- Q7. Good records can provide maintenance departments with detailed information about ALL of th...
- Q8. Dew point is the temperature at which
- Q9. The NACE Inspector should perform tests for soluble salts:...
- Q10. You are the NACE Inspector on a job where the Owner's specification requites you to perfor...
- Q11. If the project specification DOES NOT state the specific DFT measurement standards, the in...
- Q12. What is the minimum recommended distance away from an edge that an inspector should take a...
- Q13. Most industrial coatings are:
- Q14. Passivation can best be described as:
- Q15. Stripe coats are generally applied to:
- Q16. Upon arrival of coating materials, the inspector should...
- Q17. As a NACE Coating Inspector your responsibility with respect to safety is to:...
- Q18. Checking is
- Q19. SSPC SP 1 identifies the use of:
- Q20. According to SSPC PA 2 a Spot Measurement is:
- Q21. If a Thermoset coating is heated it will:
- Q22. A single application coating film has a measured dry film thickness (DFT) between 4 and 5 ...
- Q23. The Inspector should record the serial numbers of inspection instruments:...
- Q24. What is used to determine compressed air cleanliness?...
- Q25. Corrosion generally occurs at which of the following sites:...
- Q26. If inspectors identify issues of non-conformance during an inspection, they should...
- Q27. ASTM Standards are applicable:
- Q28. Prior to using Inspection Tools the inspector must:...
- Q29. In a non-convertible coating the role of the primary solvent is to:...
- Q30. Galvanic corrosion occurs on which of the following substrates:...
- Q31. NACE SP 0178 is a standard for:
- Q32. You are an inspector on a project where SSPC SP 3 is specified. What sort of tools should ...
- Q33. Excess moisture during holiday testing can cause erroneous indications by creating a path ...
- Q34. The least effective method of surface cleaning is most likely...
- Q35. Excessive working of the surface with a power grinder can be detrimental because excessive...
