DumpsFiles
 Request Exam  Contact
  • Home
  • PRACTICE EXAMS
    Oracle
    Fortinet
    Juniper
    Microsoft
    Cisco
    Citrix
    CompTIA
    VMware
    ISC
    SAP
    EMC
    PMI
    HP
    Salesforce
    Other
  • View All Exams
  • New Dumps Files
  • Upload
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. Oracle
  3. Oracle Manufacturing Cloud 2026 Implementation Professional
  4. Oracle.1Z0-1075-26.v2026-06-30.q18
  5. Question 1

Join the discussion

Question 1/18

In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.
A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.
What is the reason for this?

Correct Answer: B
In Oracle Manufacturing Cloud, when performing a cost analysis using Cost Planning Scenarios, all components and resources involved in the assembly must be associated with the material cost plan to be included in the rolled-up cost estimates. The reason the extended costs of purchase components (P1 and P2) are not included in the rolled-up scenario is that:
Purchase components PI and P2 are not associated with the material cost plan of the Cost Planning Scenario. This means that although the components are defined in the system, they haven't been linked to the cost planning scenario, so their costs are not included in the rolled-up calculations.
Incorrect options:
Costs for purchase components PI and P2 are not defined in Cost Accounting (A): While defining costs is necessary, the issue here is the components not being associated with the cost plan.
Create Accounting (C) and Create Accounting Distributions (D) are not relevant to the rolled-up scenario in this context, as they relate to the accounting process, not cost planning.

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.
Rating:
Other Question (18q)
Q1. In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are requ...
Q2. You have been asked to set up cost estimates for 10 different purchased items. Which two t...
Q3. Which three requirements are fulfilled by nonstandard work orders?...
Q4. Your customer runs two daily shifts in their plant: morning shift and evening shift. A res...
Q5. Which statement is NOT true about the Reservations tab?...
Q6. Your client has asked you to implement the functionality to ensure that the system checks ...
Q7. Two work definitions are created in the application: one for Engine Finished Good and the ...
Q8. Your client informs you that after running the "Process Item Structure Changes to Work Def...
Q9. The pick release of a project work order creates movement requests with the project and th...
Q10. In which three ways does Supply Chain Orchestration enrich supply requests with project de...
Q11. Which statement is NOT true about user-defined work order statuses?...
Q12. In a Manufacturing Cloud implementation, users are finding it difficult to track informati...
Q13. Your client needs to implement operational checks for compliance with training and job req...
Q14. In the work execution area, which three infolets are provided to users for instant access?...
Q15. Which two reports provide work order cost-related information to Costing users?...
Q16. Which three statements are true about managing Units of Measure?...
Q17. Your client is planning to override the Plant Production Calendar with One or More Date-Ef...
Q18. Which option represents all the production exception types that can be reported by a Produ...
[×]

Download PDF File

Enter your email address to download Oracle.1Z0-1075-26.v2026-06-30.q18.pdf

Email:

DumpsFiles

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 DumpsFiles

www.dumpsfiles.com materials do not contain actual questions and answers from Cisco's certification exams.