Join the discussion
Question 28/35
You are an inspector on a project where SSPC SP 3 is specified.
What sort of tools should you expect the Contractor to use to achieve the standard?
What sort of tools should you expect the Contractor to use to achieve the standard?
Correct Answer: C
Add Comments
- Other Question (35q)
- Q1. The form of corrosion that has the largest potential for unexpected catastrophic failure i...
- Q2. A single application coating film has a measured dry film thickness (DFT) between 4 and 5 ...
- Q3. Which one of these elements is not necessary for corrosion to occur:...
- Q4. To be of value the Inspector's documentation must be:...
- Q5. You are the NACE Inspector on a job where the Owner's specification requites you to perfor...
- Q6. Prior to using Inspection Tools the inspector must:...
- Q7. Stripe coats are best applied by:
- Q8. Upon arrival of coating materials, the inspector should...
- Q9. Inspection documentation is important because:...
- Q10. In the event of a conflict between the project specification and the coating manufactures'...
- Q11. Common errors that may produce inaccurate readings when using a Dial-Type Magnetic Pull-Of...
- Q12. You are asked to be the only coating inspector on a small bridge recoating job where exist...
- Q13. Removal of welds splatter is required:
- Q14. Solvents are added to coating formulations to
- Q15. Surface profile describes:
- Q16. Daily reports are important because: Select All That Apply...
- Q17. Conventional spray is a good choice when:
- Q18. ISO SA 2 is defined as:
- Q19. When using the ISO comparator in accordance with ISO 8503, if the surface profile does not...
- Q20. Owners hire NACE Inspectors' with the expectation that:...
- Q21. ISO SA 3 is directly equivalent to:
- Q22. If the project specification DOES NOT state the specific DFT measurement standards, the in...
- Q23. Due to a previous premature coating failure the owner has required the original coating ap...
- Q24. You are the NACE Inspector on a tank lining project where a 50% solids epoxy tank lining i...
- Q25. The primary difference between Non-Convertible vs. Convertible coatings is:...
- Q26. Common errors that can produce inaccurate readings when using Wet Film Thickness (WFT) gau...
- Q27. Which one of the following documents is the best source for coating technical data:...
- Q28. You are an inspector on a project where SSPC SP 3 is specified. What sort of tools should ...
- Q29. When using a sling physchrometer a very large difference between the wet and dry bulb read...
- Q30. An inspectors personal log book should contain:...
- Q31. Most industrial coatings are:
- Q32. NACE Level 1 Inspectors have been trained to perform:...
- Q33. Inspector's daily reports are used: Select All That Apply...
- Q34. When the joint NACE/SSPC abrasive blast cleaning standards are specified, the pictures in ...
- Q35. You are the NACE Coating Inspector on an exterior job where the contractor is not using an...