DumpsFiles
 Request Exam  Contact
  • Home
  • PRACTICE EXAMS
    Oracle
    Fortinet
    Juniper
    Microsoft
    Cisco
    Citrix
    CompTIA
    VMware
    ISC
    SAP
    EMC
    PMI
    HP
    Salesforce
    Other
  • View All Exams
  • New Dumps Files
  • Upload
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. International Code Council
  3. 93-Tall-Mass-Timber-Buildings
  4. InternationalCodeCouncil.93-Tall-Mass-Timber-Buildings.v2026-11-23.q29
  5. Question 11
Verified By Experts
40%off

93-Tall-Mass-Timber-Buildings Premium Bundle

Latest 93-Tall-Mass-Timber-Buildings Exam Premium Dumps provide by TrainingDump.com to help you Passing 93-Tall-Mass-Timber-Buildings Exam! TrainingDump.com offers the updated 93-Tall-Mass-Timber-Buildings exam dumps, the TrainingDump.com 93-Tall-Mass-Timber-Buildings exam questions has been updated to correct Answer. Get the latest TrainingDump.com 93-Tall-Mass-Timber-Buildings pdf dumps with Exam Engine here:


(82 Q&As Dumps, 40%OFF Special Discount: DumpsFiles)

Join the discussion

Question 11/29

Which of the following best describes circumstances for which a separate inspection by a building official would be required for the fire protection of structural connections in buildings of Type IV-B construction?

Correct Answer: C
A separate inspection by the building official is required where the fire resistance of a structural connection in Type IV-A, IV-B, or IV-C construction is provided by wood cover calculated in accordance with Section
2304.10.1. Therefore, option C is correct.
The required inspection occurs after the calculated wood cover has been installed but before additional coverings or finishes conceal the connection. This sequencing allows the building official to verify the actual cover thickness, geometry, continuity, fit, fastening, and correspondence with the approved fire-resistance design.
The requirement is distinct from routine Chapter 17 special inspection. Although a qualified special inspector may observe connection installation and mass timber erection, Section 110.3.5 expressly identifies a required building-department inspection for this calculated wood-cover condition. The inspection cannot be bypassed merely because the connection was observed during structural installation.
A rated joint system under Section 715 is governed by its tested or listed assembly requirements but is not the circumstance identified by this specific inspection provision. The other options do not state the code trigger.
Inspectors should therefore coordinate notification before the connection is enclosed because subsequent destructive exposure may otherwise be necessary.
References/Topics: 2021 IBC Sections 110.3.5 and 2304.10.1; inspection of calculated wood cover protecting mass timber connections.

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.
Rating:
Other Question (29q)
Q1. Regarding water supply for the protection of buildings under construction, when combustibl...
Q2. Periodic special inspection of sealants or adhesives as specified by the International Bui...
Q3. Buildings of Types IV-A, IV-B, and IV-C construction designed to be greater than six stori...
Q4. Refer to the figure by clicking on the EXHIBIT button above. (Exhibit) In Type IV-B constr...
Q5. Refer to the figure by clicking on the EXHIBIT button above. (Exhibit) In Type IV-B constr...
Q6. In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are...
Q7. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) In the detail show...
Q8. Disregarding footnotes, which of the following is true regarding fire-resistance ratings o...
Q9. Calculated mass timber fire resistance can include each of the following except:...
Q10. Sealants used to resist passage of air in construction Type IV-A, shall be in accordance w...
Q11. Which of the following best describes circumstances for which a separate inspection by a b...
Q12. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) In the detail show...
Q13. A proprietary field-glued mass timber beam splice will require which of the following:...
Q14. For Type IV-A construction, noncombustible protection shall provide what fraction of the r...
Q15. Mass timber is allowed in which of the following International Building Code Construction ...
Q16. Based on the definition of cross-laminated timber (CLT), panels are manufactured as follow...
Q17. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) If the glulam beam...
Q18. The maximum allowable height for a Group E building of Type IV-A construction with an auto...
Q19. Refer to the figure by clicking on the EXHIBIT button above. (Exhibit) The exterior wall s...
Q20. According to UL Fire Resistance Directory, a "finish rating" is the time:...
Q21. Buildings of Types IV-A, IV-B, and IV-C construction designed to be greater than six stori...
Q22. Periodic special inspection of sealants or adhesives shall be conducted where sealants or ...
Q23. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) In the detail show...
Q24. For Type IV-A, IV-B, and IV-C construction, each of the following materials on the exterio...
Q25. Which of the following provisions for mass timber used for interior exit and elevator hois...
Q26. The fire-resistance of a protected mass timber assembly is equivalent to the fire resistan...
Q27. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) In the detail show...
Q28. Adhesives used to resist passage of air in construction Type IV-C, shall be in accordance ...
Q29. Which of the following provisions for mass timber used for interior exit and elevator hois...
[×]

Download PDF File

Enter your email address to download InternationalCodeCouncil.93-Tall-Mass-Timber-Buildings.v2026-11-23.q29.pdf

Email:

DumpsFiles

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 DumpsFiles

www.dumpsfiles.com materials do not contain actual questions and answers from Cisco's certification exams.