DumpsFiles
 Request Exam  Contact
  • Home
  • PRACTICE EXAMS
    Oracle
    Fortinet
    Juniper
    Microsoft
    Cisco
    Citrix
    CompTIA
    VMware
    ISC
    SAP
    EMC
    PMI
    HP
    Salesforce
    Other
  • View All Exams
  • New Dumps Files
  • Upload
  • Oracle
    Oracle
  • Fortinet
    Fortinet
  • Juniper
    Juniper
  • Microsoft
    Microsoft
  • Cisco
    Cisco
  • Citrix
    Citrix
  • CompTIA
    CompTIA
  • VMware
    VMware
  • ISC
    ISC
  • SAP
    SAP
  • EMC
    EMC
  • PMI
    PMI
  • HP
    HP
  • Salesforce
    Salesforce
  1. Home
  2. International Code Council
  3. 93-Tall-Mass-Timber-Buildings
  4. InternationalCodeCouncil.93-Tall-Mass-Timber-Buildings.v2026-11-23.q29
  5. Question 29
Verified By Experts
40%off

93-Tall-Mass-Timber-Buildings Premium Bundle

Latest 93-Tall-Mass-Timber-Buildings Exam Premium Dumps provide by TrainingDump.com to help you Passing 93-Tall-Mass-Timber-Buildings Exam! TrainingDump.com offers the updated 93-Tall-Mass-Timber-Buildings exam dumps, the TrainingDump.com 93-Tall-Mass-Timber-Buildings exam questions has been updated to correct Answer. Get the latest TrainingDump.com 93-Tall-Mass-Timber-Buildings pdf dumps with Exam Engine here:


(82 Q&As Dumps, 40%OFF Special Discount: DumpsFiles)

Join the discussion

Question 29/29

Which of the following provisions for mass timber used for interior exit and elevator hoistway enclosures is true?

Correct Answer: A
Option A correctly reflects the required noncombustible protection for protected Type IV-A mass timber.
Under IBC Section 602.4.1.2.1, the noncombustible protection applied to interior faces of Type IV-A mass timber must contribute the protection time determined by the applicable provisions of Section 722.7, but not less than 80 minutes .
The broader Type IV provisions are particularly important for interior exit and elevator hoistway enclosures.
In qualifying tall mass timber buildings with an occupied floor more than 75 feet above the lowest level of fire department access, mass timber interior exit and elevator hoistway enclosures are permitted up to the specified height limits only where protected in accordance with Section 602.4.1.2. For a two-hour, 120- minute-rated enclosure, at least 80 minutes must therefore come from the prescribed noncombustible protection.
Type IV-B likewise uses an 80-minute minimum for protected interior mass timber, so option B ' s 40-minute value is incorrect. Type IV-C has different exposure allowances and shaft-protection provisions, but option C does not state the controlling tall-building enclosure requirement tested here. Type IV-HT is not governed by the Type IV-A tall mass timber enclosure protection rule.
References/Topics: 2021 IBC Sections 602.4 and 602.4.1.2 through 602.4.1.2.1; Section 722.7.

Add Comments

Your email address will not be published. Required fields are marked *

insert code
Type the characters from the picture.
Rating:
Other Question (29q)
Q1. Regarding water supply for the protection of buildings under construction, when combustibl...
Q2. Periodic special inspection of sealants or adhesives as specified by the International Bui...
Q3. Buildings of Types IV-A, IV-B, and IV-C construction designed to be greater than six stori...
Q4. Refer to the figure by clicking on the EXHIBIT button above. (Exhibit) In Type IV-B constr...
Q5. Refer to the figure by clicking on the EXHIBIT button above. (Exhibit) In Type IV-B constr...
Q6. In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are...
Q7. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) In the detail show...
Q8. Disregarding footnotes, which of the following is true regarding fire-resistance ratings o...
Q9. Calculated mass timber fire resistance can include each of the following except:...
Q10. Sealants used to resist passage of air in construction Type IV-A, shall be in accordance w...
Q11. Which of the following best describes circumstances for which a separate inspection by a b...
Q12. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) In the detail show...
Q13. A proprietary field-glued mass timber beam splice will require which of the following:...
Q14. For Type IV-A construction, noncombustible protection shall provide what fraction of the r...
Q15. Mass timber is allowed in which of the following International Building Code Construction ...
Q16. Based on the definition of cross-laminated timber (CLT), panels are manufactured as follow...
Q17. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) If the glulam beam...
Q18. The maximum allowable height for a Group E building of Type IV-A construction with an auto...
Q19. Refer to the figure by clicking on the EXHIBIT button above. (Exhibit) The exterior wall s...
Q20. According to UL Fire Resistance Directory, a "finish rating" is the time:...
Q21. Buildings of Types IV-A, IV-B, and IV-C construction designed to be greater than six stori...
Q22. Periodic special inspection of sealants or adhesives shall be conducted where sealants or ...
Q23. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) In the detail show...
Q24. For Type IV-A, IV-B, and IV-C construction, each of the following materials on the exterio...
Q25. Which of the following provisions for mass timber used for interior exit and elevator hois...
Q26. The fire-resistance of a protected mass timber assembly is equivalent to the fire resistan...
Q27. Refer to the exhibit by clicking on the EXHIBIT button above. (Exhibit) In the detail show...
Q28. Adhesives used to resist passage of air in construction Type IV-C, shall be in accordance ...
Q29. Which of the following provisions for mass timber used for interior exit and elevator hois...
[×]

Download PDF File

Enter your email address to download InternationalCodeCouncil.93-Tall-Mass-Timber-Buildings.v2026-11-23.q29.pdf

Email:

DumpsFiles

Our website provides the Largest and the most Latest vendors Certification Exam materials around the world.

Using dumps we provide to Pass the Exam, we has the Valid Dumps with passing guranteed just which you need.

  • DMCA
  • About
  • Contact Us
  • Privacy Policy
  • Terms & Conditions
©2026 DumpsFiles

www.dumpsfiles.com materials do not contain actual questions and answers from Cisco's certification exams.